(2)
Remove the fairing (2).
EFF : ALL
53-55-12Page 403
R Rudder Fairing - Removal/Installation Figure 401/TASK 53-55-12-991-001
EFF : ALL 53-55-12 Page 404 Aug 01/02
CES
TASK 53-55-12-400-001
Installation of the Rudder Fairings 325AL and 325AR
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific lintfree cloth
No specific nonmetallic scraper
No specific warning notice
R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 05-013A C Z-24.223
RELEASE AGENT (Ref. 20-31-00)
Material No. 09-016 USA MIL-PRF-81733D TYPE II CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)
Material No. 09-018 USA AMS 3267/3
CORROSION INHIBITING LOW ADHESION SEALANT
(Ref. 20-31-00)
Material No. 11-003 USA ASTM D 740
METHYL-ETHYL-KETONE (Ref. 20-31-00)
EFF : ALL
53-55-12Page 405
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-10-00-864-001 Depressurize the Green Hydraulic System 29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-10-00-864-003 Depressurize the Blue Hydraulic System 53-55-12-991-001 Fig. 401
3. Job Set-up
__________
Subtask 53-55-12-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the aircraft is in the same configuration as for the removal task.
(2)
Make sure the warning notice is in position to tell persons not to operate the flight controls.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION
_______
BEFORE YOU START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
Subtask 53-55-12-864-051
B. Make sure the Green, Yellow and Blue hydraulic systems are depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00-864-003).
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______ ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
EFF : ALL
53-55-12Page 406
Subtask 53-55-12-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11 49VU FLIGHT CONTROLS/THS/ACTR/MOT2 19CE2 B09 49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08 49VU AUTO FLT/FAC1/28VDC 5CC1 B04 49VU AUTO FLT/FAC1/26VAC 14CC1 B03
R 105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02 R 105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01 R 105VU FLT CTL/SEC1/STBY SPLY 22CE B01 R
121VU AUTO FLT/RUDDER/TRIM/IND 15CC M20 121VU AUTO FLT/FAC2/28VDC 5CC2 M19 121VU AUTO FLT/FAC2/26VAC 14CC2 M18 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18 121VU FLIGHT CONTROLS/THS ACTR/MOT3 19CE3 Q17 121VU FLIGHT CONTROLS/THS ACTR/MOT1 19CE1 Q16 121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
4. Procedure
_________
Subtask 53-55-12-914-050
A. Preparation for Installation:
(1) Clean the mating surfaces of the fairing with a nonmetallic scraper, CLEANING AGENTS (Material No. 11-003) and a lintfree cloth.
WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE
_______
SPECIAL MATERIAL.
THIS MATERIAL IS DANGEROUS.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(127)