4. Procedure
_________
 Subtask 31-36-00-960-050
 A. Replacement of DMU Batteries R (Ref. Fig. 205/TASK 31-36-00-991-002)
 (1)
 Removal of the DMU batteries:
 (a)
 Loosen the 2 captive screws on the battery housing cover on the rear panel of the unit.
 (b)
 Remove the battery housing cover.
 (c)
 Remove the batteries.
 (2)
 Installation of the DMU batteries:
 (a)
 Put the new batteries into the space provided in the rear of the unit. Make sure the polarity (+/-) is correct.
 (b)
 Put the battery housing cover in the location provided on the rear of the unit.
 (c)
 Attach the 2 captive screws on the battery housing cover.
 5. Close-up
________
 Subtask 31-36-00-400-053
 A. Install the DMU (Ref. TASK 31-36-34-400-001). 
R 1EFF : 001-049, 051-099, 101-105, 1 31-36-00Page A228 1 1 Aug 01/05 1 1 1CES 1
 Replacement of the DMU Batteries R Figure 205/TASK 31-36-00-991-002 
R 1EFF : 001-049, 051-099, 101-105, 1 31-36-00Page A229 1 1 Aug 01/05 1 1 1CES 1 Subtask 31-36-00-410-065
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.
 (2)
 Close the access door 824. (Ref. TASK 52-41-00-410-002)
 (3)
 Remove the access platform(s). Subtask 31-36-00-710-072
 C.
 Operational test of the DMU (Ref. TASK 31-36-00-710-001).
R 1EFF : 001-049, 051-099, 101-105, 1 31-36-00Page A230 1 1 Aug 01/05 1 1 1CES 1 AIDS INTERCONNECTION ((FDIMU, DAR)) - ADJUSTMENT/TEST
_____________________________________________________ R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,
 TASK 31-36-00-710-001
 Test of the DMU (1TV)
 1.
 Reason for the Job
__________________
 Self Explanatory
 2.
 Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 31-32-00-860-008 Procedure to Get Access to the SYSTEM REPORT/TEST/INST Page
 3. Job Set-up
__________
 Subtask 31-36-00-861-050
 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).
 (2)
 Energize the CFDS (Ref. TASK 31-32-00-860-008).
 1EFF : ALL 1 31-36-00Page 501 1 1 May 01/05 1 1 1CES 1 Subtask 31-36-00-865-050
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU RCDR/ACCLRM 9TU K18 121VU AIDS/DMU 4TV K15
 4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-105,
 Subtask 31-36-00-710-052
 A. Do the DMU Fault Monitoring test. NOTE : If the PRINT> prompt shows on the MCDU display you can print the
____
 available information.
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the MCDU: 
-
Push the line key adjacent to <CFDS indication.
 -
Push the line key adjacent to <SYSTEM REPORT/TEST indication.
-
Push the line key adjacent to INST> indication.
-
Push the line key adjacent to DMU> indication.
 -
Push line key adjacent to TEST> indication.
 -
Push the line key adjacent to <DMU POWER-UP TEST indication.
On the MCDU display:
-
The CFDS page comes into view.
-
The SYSTEM REPORT/TEST page comesinto view.
-
The SYSTEM REPORT/TEST - INST pagecomes into view.
-
The AIDS page comes into view.
-
The AIDS TEST page comes into view.
-
The message IN PROGRESS shows.
-After 4 seconds the message TEST OK shows. 
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 31-36-00Page 502 1201-210, 1May 01/05 1 1 1CES 1
 -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 指示/记录系统 4(25)