• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:43来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_______ EXTEND/RETRACT THE RAT.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job__________________ Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific container No specific safety barriers No specific warning notice(s) No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft)
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-54Page 406 1 1 May 01/05 1 1 1CES 1


 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 02-003  F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)
 Material No. 05-002  USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
 Material No. 09-018  USA AMS 3267/3 CORROSION INHIBITING LOW ADHESION SEALANT (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
 Power Supply 29-10-00-864-003 Depressurize the Blue Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector 29-22-00-720-001 Operational Test of the Manual Deployment of the Ram
 Air Turbine. Functional Test of the Ram Air Turbine 29-22-00-869-001 Extension of the Ram Air Turbine (RAT) on the Ground 32-12-00-010-001 Open the Main Gear Doors for Access 29-22-54-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 29-22-54-860-052
 A. Aircraft Maintenance Configuration
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 (1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-54Page 407 1 1 May 01/05 1 1 1CES 1


 (2)
 Make sure that the warning notice(s) are in position to tell persons not to pressurize the Blue hydraulic system:

 -In the cockpit on the hydraulic section 40VU of the overhead panel,
 -On the ground service panel of the Blue hydraulic system.

 (3)
 Make sure that the safety barriers are in position.

 (4)
 Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).

 (5)
 Make sure that the reservoir of the Blue hydraulic system is depressurized. (Ref. TASK 29-14-00-614-001).

 (6)
 Make sure that the RAT is extended (Ref. TASK 29-22-00-869-001).

 (7)
 Make sure that the left-hand main gear main door is open (Ref. TASK 32-12-00-010-001).

 (8)
 Make sure that the access door 197EB is open.

 (9)
 Make sure that the container is in position below the hydraulic connections to collect hydraulic fluid.


 Subtask 29-22-54-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------106VU CSM/G /EV/MAN/SPLY 6XE B04 121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
R **ON A/C 001-049, 051-061, 101-102, 201-202,
 121VU HYDRAULIC/RAT/CTL 2801GE P32
R **ON A/C 103-105, 203-203,
 121VU HYD/RAT/CTL 2801GE P32
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-54Page 408 1 1 May 01/05 1 1 1CES 1R **ON A/C 001-049, 051-061, 101-105, 201-203,


 4. Procedure
_________
 (Ref. Fig. 401/TASK 29-22-54-991-001)
 Subtask 29-22-54-860-051
 A. Preparation for Installation WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压6(64)