(15)
Put the bonding jumper (20) in position and install the nut (22) and the washers (21) (Ref. TASK 20-28-00-912-004).
(16)
Remove the blanking caps and the blanking plugs from the ports and the unions.
(17)
Attach the union nuts (17) and (18) to the ports (16) and (19).
(18)
TORQUE the union nut (17) to between 2.9 and 3.2 m.daN (21.38 and
23.59 lbf.ft).
(19)
TORQUE the union nut (18) to between 2.0 and 2.3 m.daN (14.74 and
16.96 lbf.ft).
(20)
Safety the union nuts (17) and (18) with the lockwire 0.4 mm (0.015 in.).
(21)
Put the eyebolt of the ejection jack (10) in position on the leg assembly (11).
(22)
Install the bolt (14), the washers (12) and the nut (13).
(23)
TORQUE the nut (13) to between 2.45 and 2.55 m.daN (18.06 and 18.80 lbf.ft).
(24)
Remove the blanking caps from the electrical connectors (7),(8),(9) and the receptacles.
(25)
Connect the electrical connectors (7),(8) and (9) to the receptacles.
(26)
Install the protective cover over the RAT deployment solenoids. Subtask 29-22-53-865-052
B.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2801GE, 2803GE, 6XE
Subtask 29-22-53-790-051
C. Leak Test of the Hydraulic Connections
(1) Make sure that the fluid level in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-53Page 411 1 1 Config-1 May 01/05 1 1 1CES 1
(2)
Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-002).
(3)
Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(4)
Examine the hydraulic connections of the ejection jack and make sure that there are no leaks.
(5)
Remove the access platform.
(6)
Remove the container from below the hydraulic connections. Subtask 29-22-53-820-051
D.
Do the adjustment procedure of the RAT doors (Ref. TASK 29-22-00-820-001).
Subtask 29-22-53-710-051
E. Do an operational test of the manual deployment of the RAT (Ref. TASK 29-22-00-710-003).
5. Close-up
________ Subtask 29-22-53-860-054
A. Put the aircraft back to the serviceable condition.
(1)
Make sure that the Blue hydraulic system is depressurized. (Ref. TASK 29-10-00-864-003).
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Install the sidewall panel (Ref. TASK 29-22-51-400-001).
(4)
Close the access door 197EB.
(5)
Close the left main gear main door (Ref. TASK 32-12-00-010-001).
(6)
Remove the safety barrier.
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-53Page 412 1 1 Config-1 May 01/05 1 1 1CES 1R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
TASK 29-22-53-000-010
Removal of the RAT Ejection Jack (1GE)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific blanking plugs
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific warning notice(s)
No specific 1 CAP - PROTECTION
No specific 1 CONTAINER 5 L(1 1/2 USGAL)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-22-00-869-005 Extension of the Ram Air Turbine (RAT) on the Ground 32-12-00-010-001 Open the Main Gear Doors for Access 29-22-53-991-011 Fig. 402 29-22-53-991-012 Fig. 403
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-53Page 413 1301-399, 401-499, 1Config-1 Aug 01/05 1 1 1CES 1
3. Job Set-up
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压6(47)