(2)
Extend the RAT (Ref. TASK 29-22-00-869-005).
(3)
Put the warning notices in position to tell persons not to operate the RAT: - on the overhead panels 21VU and 40VU. - on the RAT ground control panel 3GE.
Subtask 29-22-51-865-092
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/RAT/CTL 2801GE D14 106VU CSM/G /EV/MAN/SPLY 6XE B04 121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-51Page 302 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
4. Procedure
_________
(Ref. Fig. 301/TASK 29-22-51-991-022) Subtask 29-22-51-680-052
A. Draining of the Ram Air Turbine Oil Drain Tank
(1)
Remove the clamp (13) from the tank (14).
(2)
Remove the tank (14) from the cover plate (15).
(3)
Remove the grommet (11), the cover (12) and the tube (10).
(4)
Drain the hydraulic fluid from the tank (14) into a container 3.0 l (0.7923 USgal).
(5)
Install the tank (14) with the clamp (13) at the cover plate (15).
(6)
Install the tube (10), the cover (12) and the grommet (11).
5. Close-up
________ Subtask 29-22-51-865-093
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6XE, 2801GE, 2803GE
Subtask 29-22-51-860-096
B. Put the aircraft back to the serviceable condition.
(1)
Clean the component interface and/or the adjacent area.
(2)
Remove the container.
(3)
Make sure that the work area is clean and clear of tool(s) and other items.
(4)
Remove the warning notice(s).
(5)
Retract the RAT (Ref. TASK 29-22-00-869-006).
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-51Page 303 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
Ram Air Turbine Oil Drain Tank
Figure 301/TASK 29-22-51-991-022
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-51Page 304 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1 RAM AIR TURBINE (RAT) (2140GE) - REMOVAL/INSTALLATION
_____________________________________________________ R **ON A/C 001-049, 051-061, 101-105, 201-203,
TASK 29-22-51-000-001 Removal of the Ram Air Turbine 2140GE WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific blanking plugs
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific warning notice(s)
No specific container 4.0 l (1.0566 USgal)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压6(6)