(10) If necessary, add fluid to the reservoir(s) (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).
4. Procedure
_________
Subtask 29-32-00-710-052
A. Do this test:
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1.
Pressurize the Yellow hydraulic system from a ground supply, through the PTU or with the electric pump (Ref. TASK 29-10-00-863-002) or (Ref. TASK 29-23-00-863-002) or (Ref. TASK 29-24-00-863-001).
2.
On the overhead panel 50VU:
-lift the guard and push and release the HYD /LEAK MEASUREMENT VALVES/Y P/BSW.
3. Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864-002) or (Ref. TASK 29-23-00-864-001) or (Ref. TASK 29-24-00-864-001).
On the ECAM lower DU:
-
the Yellow system pressure is 3000psi approximately.
-
the system name is white.
-
the flow arrow is green.
On the overhead panel 50VU:
-
the OFF light of the HYD /LEAKMEASUREMENT VALVES/Y P/BSW comes on.
On the ECAM lower DU:
-
the color of the system name changes from white to amber.
-
the color of the flow arrow changes from green to amber.
On the ECAM lower DU:
-
the digital display of the systempressure shows the reduction of thepressure in the Yellow system.
-
the color of the digital display of the system pressure changes from green to amber at approximately 1450 psi.
5. Close-up
________ Subtask 29-32-00-860-054
A. Put the aircraft back to the serviceable condition.
(1)
On the overhead panel 50VU, push the HYD /LEAK MEASUREMENT VALVES/Y P/BSW. Make sure that the OFF light goes out.
(2)
If the PTU is isolated, connect the PTU isolation coupling (Ref. TASK 29-23-00-860-002).
(3)
Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).
(4)
De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
PRESSURE TRANSDUCER - HYDRAULIC (1065GN,2065GN,3065GN,3068GN)_____________________________________________________________ REMOVAL/INSTALLATION____________________
TASK 29-32-11-000-001
R Removal of the Hydraulic Pressure Transducer (1065GN)
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING_______ GEAR.
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
RR R R R No specific No specific No specific No specific No specific circuit breaker(s) safety clip(s) 1 CAP - BLANKING 1 CONTAINER 3 L(3/4 USGAL) 2 PLUG - BLANKING 2 WARNING NOTICE
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 29-00-00-910-002 29-14-00-614-001 29-23-00-860-001 32-12-00-010-001 29-32-11-991-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance ActionSafety Procedures of the Hydraulic SystemDepressurization of the Hydraulic ReservoirsDisconnection of the Isolation Coupling of the Power Transfer Unit (PTU)Open the Main Gear Doors for AccessFig. 401
3. Job Set-up__________
Subtask 29-32-11-010-050
A. Open one main door of the main gear (Ref. TASK 32-12-00-010-001).
Subtask 29-32-11-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/HYD/PRESS/XMTR 1841GN C11
Subtask 29-32-11-860-051
C. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES._______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).