• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:43来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 NOTE : Attach the cable to the structure so that the disconnected
____ end of the connector points down. This prevents the contamination of the connector with oil or other liquids.
 (5)
 Put a notice in the flight compartment to tell the crew:

 -that the RSVR LO AIR PRESS warning for the Green or Yellow hydraulic system does not operate.

 (6)
 Look on the air pressure gages on the applicable reservoir and make sure that the air pressure is not less than 37 psi.

 (7)
 If necessary, pressurize the reservoir (Ref. TASK 29-14-00-614-002).


 5. Close-up
________ Subtask 29-34-00-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the access platform.

 (3)
 Close the applicable access door(s)


 -196BB and the RH main gear door (Ref. TASK 32-12-00-410-001), or
 -the main gear door (Ref. TASK 32-12-00-410-001).
 1EFF : ALL 1 29-34-00Page 404 1 1 Nov 01/02R 1 1 1CES 1


 Subtask 29-34-00-865-051
 B. Close the applicable circuit breaker(s)
 -1702GK or 3700GD.
 1EFF : ALL 1 29-34-00Page 405 1 1 Nov 01/02R 1 1 1CES 1


 TASK 29-34-00-440-001
 Reactivation of the Reservoir Air Pressure Switches of the Green and Yellow Hydraulic System
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 29-30-04-B)
 Indicating - Warning and Caution on ECAM
 RSVR LO AIR PR

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific access platform 2.3 m (7 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector
 32-12-00-010-001 Open the Main Gear Doors for Access
 32-12-00-410-001 Close the Main Gear Doors after Access

R 29-34-00-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 29-34-00-865-052
 A. Open the related circuit breaker for the applicable pressure switch FOR 1384GH 1702GK FOR 3384GH 3700GD Subtask 29-34-00-010-051


 B. Get Access
 (1) Open the applicable access door for the pressure switch: - one main gear door for 1384GH (Ref. TASK 32-12-00-010-001).
 NOTE : Access is better from the Right Hand (RH) side.
____
 -196BB and the RH main gear door for 3384GH (Ref. TASK 32-12-00-010-001).
 (2) Put an access platform in position to be satisfactory for the Green reservoir.
 4. Procedure
_________ Subtask 29-34-00-440-050 R A. Reactivation of the Reservoir Air Pressure-Switches (Ref. Fig. 401/TASK 29-34-00-991-001)
 (1)
 Cut and discard the tie-wrap which attaches the cable of the pressure switch 1384GH or 3384GH to the structure.

 (2)
 Remove the protective caps from the connector (1) and the receptacle.

 (3)
 Make sure that the electrical connectors are clean and in the correct condition.

 (4)
 Connect the applicable electrical connector (1) 1384GH-A or 3384GH-A to the related pressure switch.


R (5) Do the troubleshooting of the air pressure indication-system and do R the applicable corrective procedure.
 (6) Make sure that the reservoir is pressurized with air to the correct pressure (Ref. TASK 29-14-00-614-002).


 5. Close-up
________ Subtask 29-34-00-410-051
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access door as applicable:


 -196BB and/or
 -the main gear door (Ref. TASK 32-12-00-410-001).
 (3)
 Remove the warning notice from the flight compartment. Subtask 29-34-00-865-053

 B.
 Close the applicable circuit breaker:


 -1702GK or 3700GD.
R 1EFF : ALL 1 29-34-00Page 408 1 1 Nov 01/02 1 1 1CES 1

 

R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,

 TASK 29-34-00-040-002
 Deactivation of the Reservoir Air Pressure Switch and Check of the Reservoir Air Pressure of the Blue Hydraulic System
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压6(163)