 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 29-30-04-B)
 Indicating - Warning and Caution on ECAM
 RSVR LO AIR PR

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific protective caps
 No specific tie-wrap
 No specific access platform 2.3 m (7 ft. 7 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through the Ground Connector 29-34-00-991-002 Fig. 402
 3. Job Set-up
__________
 Subtask 29-34-00-865-064
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-34-00Page 409 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 29-34-00-010-053


 B. Get Access
 (1)
 Open the access door 197FB.

 (2)
 Put an access platform in position to be satisfactory for the Blue reservoir.


 4. Procedure
_________ Subtask 29-34-00-040-051
 A. Deactivation of the Reservoir Air Pressure Switch
 (Ref. Fig. 402/TASK 29-34-00-991-002)

 (1)
 Disconnect the electrical connector (1) 2384GH-A from the pressure switch.

 (2)
 Install the protective caps on the disconnected connector (1) and on the receptacle.

 (3)
 Use a tie-wrap and attach the disconnected cable to a part of the structure.


 NOTE : Attach the cable to the structure so that the disconnected end
____ of the connector points down. This prevents the contamination of the connector with oil or other liquids.
 (4)
 Put a notice in the flight compartment to tell the crew:

 -that the RSVR LO AIR PRESS warning for the Blue hydraulic system does not operate.

 (5)
 Look on the air pressure gages of the reservoir and make sure that the air pressure is not less than 37 psi.

 (6)
 If necessary, pressurize the reservoir (Ref. TASK 29-14-00-614-002).


R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-34-00Page 410 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 Reservoir Air Pressure Switch of the Blue Hydraulic System
 Figure 402/TASK 29-34-00-991-002

R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-34-00Page 411 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 5. Close-up
________ Subtask 29-34-00-410-053
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the access platform.


 (3)
 Close the access door 197FB. Subtask 29-34-00-865-065

 B.
 Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2702GJ.


R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-34-00Page 412 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 TASK 29-34-00-440-002 Reactivation of the Reservoir Air Pressure Switch of the Blue Hydraulic System
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 29-30-04-B)
 Indicating - Warning and Caution on ECAM
 RSVR LO AIR PR

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific access platform 2.3 m (7 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-14-00-614-002  Pressurization of the Hydraulic Reservoirs through the Ground Connector 29-34-00-991-002 Fig. 402
 3. Job Set-up
__________ Subtask 29-34-00-865-066
 A. Open, safety and tag this(these) circuit breaker(s):
 