_______
(1)
Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2)
Put the warning notice(s) in position to tell persons not to pressurize the Blue hydraulic system:
-in the cockpit on the hydraulic section 40VU of the overhead panel, - on the ground service panel of the Blue hydraulic system.
(3)
Put the safety barriers in position.
(4)
Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).
(5)
Depressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-001).
(6)
Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-001).
(7)
Put a container below the RAT.
1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-51Page 473 1 1 Config-1 Aug 01/05R 1 1 1CES 1
Subtask 29-22-51-865-069
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------106VU CSM/G /EV/MAN/SPLY 6XE B04 121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
**ON A/C 001-049, 051-061, 101-102, 201-202,
121VU HYDRAULIC/RAT/CTL 2801GE P32 **ON A/C 103-105, 203-203,
121VU HYD/RAT/CTL 2801GE P32 **ON A/C 001-049, 051-061, 101-105, 201-203,
4. Procedure
_________
(Ref. Fig. 408/TASK 29-22-51-991-010) Subtask 29-22-51-020-056
A. Removal of the Turbine Assy of the RAT
(1)
Bend the tab of each tab washer (3) to release the nuts (4).
(2)
Support the turbine assy (5).
(3)
Remove the nuts (4) and the tab washers (3).
(4)
Discard the tab washers (3).
(5)
Carefully pull the turbine assy (5) from the drive quill. NOTE : Do not put the turbine assy down on the turbine blades.
(6)
Remove and discard the O-rings (1) and (2).
____
1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-51Page 474 1 1 Config-1 Aug 01/05R 1 1 1CES 1
Turbine Assy of the Ram Air Turbine
Figure 408/TASK 29-22-51-991-010
1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-51Page 475 1 1 Config-1 Aug 01/05R 1 1 1CES 1
TASK 29-22-51-400-005 Installation of the Turbine Assy of the Ram Air Turbine (RAT) WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______ EXTEND/RETRACT THE RAT.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific Torque Wrench : range 36.00 to 220.00 lbf.in
(0.40
to 2.60 m.daN) DAH600865 1 ADAPTER - TORQUE
B.
Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 02-003 F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)
Material No. 04-021 USA MIL-P-8116 GREASE (Ref. 20-31-00)
1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-51Page 476 1 1 Config-1 Aug 01/05R 1 1 1CES 1
C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
1 O-ring 29-22-51 01 -096
2 O-ring 29-22-51 01 -094
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压6(28)