• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:43来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11 R 105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02 R 105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01 R
 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18 121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
 Subtask 29-32-12-860-050
 C. Aircraft Maintenance Configuration
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 (1)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (2)
 Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).

 (3)
 Depressurize the reservoir of the Green hydraulic system (Ref. TASK 29-14-00-614-001).

 (4)
 Put the warning notices in position to tell persons not to pressurize the Green hydraulic system:

 -in the cockpit on the hydraulic section 40VU of the overhead panel, - on the ground service panel of the Green hydraulic system.

 (5)
 Put the access platform in position at the main door of the main gear.

 (6)
 Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-860-001).

 (7)
 Put the container in position below the system pressure switch to collect any hydraulic fluid.

 


 4. Procedure
_________
 (Ref. Fig. 401/TASK 29-32-12-991-001) Subtask 29-32-12-020-050
 A. Removal of the System Pressure Switch
 (1)
 Disconnect the electrical connector (1).

 (2)
 Put the blanking cap on the disconnected electrical connector (1).

 (3)
 Remove the nut (5), the washer (6), the screw (8), the bonding jumper

 (7) and the clamp (9) from the system pressure switch (2).

 (4)
 Cut and remove the lockwire.

 (5)
 Loosen the system pressure switch (2) and remove it together with the O-ring (3) from the manifold (4).

 (6)
 Discard the O-ring.

 (7)
 Install the blanking plugs in the open ports.

 


 System Pressure Switch of the Green and Yellow Hydraulic Systems
 Figure 401/TASK 29-32-12-991-001

 

 TASK 29-32-12-400-001
 Installation of the System Pressure Switch (1151GN)
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
 CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.

 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
 No specific container
 No specific warning notices
 No specific access platform 2.8 m (9 ft. 2 in.)
 No specific Torque Wrench : range 0.20 to 3.60 m.daN

 (2.00 to 26.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific  lockwire, corrosion-resistant steel 0.8 mm (0.032 in.)
R Material No. 02-003  F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)

 

 C. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
 -------------------------------------------------------------------------------
3 O-ring 29-32-03 01A-070
 3 O-ring 29-32-03 01B-070
 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
20-28-00-912-004 Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage R and in the Wings (this does not include the tanks)-29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-863-001 Pressurize the Green Hydraulic System 29-10-00-864-001 Depressurize the Green Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压6(145)