C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
7 packing 29-22-53 01B-110
D. Referenced Information
------------------REFERENCE -------------------------------DESIGNATION ------------------------------
-------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
Power Supply 29-10-00-864-003 Depressurize the Blue Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector 29-22-00-710-007 Operational Test of the Manual Deployment and the
Retraction of the Ram Air Turbine 29-22-00-869-005 Extension of the Ram Air Turbine (RAT) on the Ground 29-22-00-869-006 Retraction of the Ram Air Turbine (RAT) on the Ground 32-12-00-010-001 Open the Main Gear Doors for Access 29-22-53-991-015 Fig. 406
3. Job Set-up
__________
Subtask 29-22-53-860-090
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1)
Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2)
Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(3)
Make sure that the reservoir of the Blue hydraulic system is depressurized. (Ref. TASK 29-14-00-614-001).
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-53Page 453 1301-399, 401-499, 1Config-1 Aug 01/05 1 1 1CES 1
(4)
Make sure that the left main gear door is open (Ref. TASK 32-12-00-010-001).
(5)
Make sure that the access door 195BB is open.
(6)
Make sure that the access panel 147BB is open.
(7)
Make sure that the access panel 147CB is open.
(8)
Make sure that the warning notices are in position to tell persons not to pressurize the Blue hydraulic system:
-in the cockpit on the hydraulic section 40VU of the overhead panel, - on the ground service panel of the Blue hydraulic system.
(9)
Make sure that the safety barriers are in position.
(10)
Make sure that the RAT is extended (Ref. TASK 29-22-00-869-005).
(11)
Make sure that the protective cover of the RAT compartment is removed.
Subtask 29-22-53-865-086
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14 106VU CSM/G /EV/MAN/SPLY 6XE B04 121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
(Ref. Fig. 406/TASK 29-22-53-991-015) Subtask 29-22-53-420-066
A. Installation of the Pressure Switch
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Apply HYDRAULIC FLUIDS (Material No. 02-003) to the new packing (7).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压6(58)