• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:43来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 (10) If necessary, adjust the thickness of the shim (9).
 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-51Page 469 1 1 Config-1 Aug 01/05R 1 1 1CES 1


 Subtask 29-22-51-420-056
 B. Installation of the Filter NOTE : If, during the "Preparation for Installation", you find that the
____ shim (9) is not necessary, then ignore the text which refers to the shim.
 (1)
 Lubricate the new O-ring (7) with HYDRAULIC FLUIDS (Material No. 02-003).

 (2)
 Put the O-ring (7) on the filter (8).

 (3)
 Do a check of the filter (8) and make sure that it is clean and not damaged.

 (4)
 Carefully put the filter (8) in the port (6).

 (5)
 Lubricate the new O-ring (10) with HYDRAULIC FLUIDS (Material No. 02-003).

 (6)
 Put the O-ring (10) on the filter plug (11).

 (7)
 Lubricate the threads of the filter plug (11) and the shim (9) with HYDRAULIC FLUIDS (Material No. 02-003).

 (8)
 Put the shim (9) in the filter plug (11). Make sure that the shim is installed correctly.

 (9)
 Install the filter plug (11) with the shim (9) in the port (6).


 (10)
 Torque the filter plug (11) to between 1.08 and 1.36 m.daN (95.57 and

 120.35 lbf.in).

 (11)
 Safety the filter plug (11) with lockwire, corrosion resistant steel dia 0.8 mm (0.0315 in.).


 Subtask 29-22-51-865-066
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6XE, 2801GE, 2803GE
 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-51Page 470 1 1 Config-1 Aug 01/05R 1 1 1CES 1


 Subtask 29-22-51-790-051
 D. Test
 (1)
 Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-002).

 (2)
 Make sure that the level of the fluid in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).

 (3)
 Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).

 (4)
 Examine the filter plug and make sure that there are no leaks.

 (5)
 Make sure that the clogging indicator does not show a blocked filter.


 5. Close-up
________ Subtask 29-22-51-860-065
 A. Put the aircraft back to the serviceable condition.
 (1)
 Remove the container from below the RAT.

 (2)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (3)
 Retract the RAT (Ref. TASK 29-22-00-869-002).

 (4)
 Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).

 (5)
 Remove the warning notice(s).


 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-51Page 471 1 1 Config-1 Aug 01/05R 1 1 1CES 1


 TASK 29-22-51-000-005 Removal of the Turbine Assy of the Ram Air Turbine (RAT) WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
 WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______ EXTEND/RETRACT THE RAT.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job__________________ Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific safety barriers
 No specific warning notice(s)
 No specific container 4.0 l (1.0566 USgal)

 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-51Page 472 1 1 Config-1 Aug 01/05R 1 1 1CES 1


 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-22-00-869-001 Extension of the Ram Air Turbine (RAT) on the Ground 29-22-51-991-010 Fig. 408
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压6(27)