R 1EFF : 151-199, 301-399, 401-499, 1 29-22-51Page 435 1 1 Config-1 Aug 01/05 1 1 1CES 1
R (28) Install the bush (15), the bush (19), the bush (24) and the flanged
R bush (30) in the distance fork (23) and the swivel pin (29).
R (29) Installation of the door links.
R CAUTION : BE CAREFUL WHEN YOU CONNECT THE RODS TO THE RAT DOOR. IF_______
R YOU DO NOT CONNECT THESE PARTS CORRECTLY, YOU CAN CAUSE
R DAMAGE TO THE RODS, OR FAILURE OF THE RAT.
R (a) Put the inner door link (22) in position on the related distance
R fork (23).
R (b) Install the bolt (26), the washers (18), (25) and the nut (17).
R (c) Tighten the nut (17) and safety it with a new cotter pin (16).
R (d) Put the outer door link (31) in position between the forks of the
R swivel pin (29).
R (e) Install the bolt (27) with the washers (28), (14) and the nut
R (13).
R (f) Tighten the nut (13) and safety it with a new cotter pin (12).
R (g) Make sure that the inner door link (22) and the outer door link
R (31) are correctly connected to the RAT doors:
R 1 Refer to the labels on the inner side of the RAT doors for the_
R correct connection data.
R (30) Put the cable (40) with the P-clips (43) in position on the structure
R of the RAT stowage compartment.
R (31) Attach the P-clips (43) in the RAT stowage compartment with the
R screws (41), the washers (42) and the spacers (44).
R (32) Remove the blanking caps from the electrical connectors (2) and (53).
R (33) Remove the blanking caps from the electrical receptacles (3) and
R (52).
R (34) Make sure that the electrical connectors are clean and in the correct
R condition.
R (35) Connect the electrical connectors (2) and (53) to the receptacles (3)
R and (52).
R 1EFF : 151-199, 301-399, 401-499, 1 29-22-51Page 436 1 1 Config-1 Aug 01/05 1 1 1CES 1
R R (36) Connect the electrical connectors (98), (99), (100) and (101) to the ejection jack (10).
R R (37) Install the bonding lead (93) with the washer (94) and the screw (95) at the ejection jack (10).
R R (38) Put the protection cover (4) in the correct position at the RAT compartment (96).
R (39) Tighten the screws (5) in the quick-release fasteners (6).
R (40) Install the screw (97) in the protective cover (4).
R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
Subtask 29-22-51-611-057
C. Make sure that the level of the fluid in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).
Subtask 29-22-51-865-096
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2801GE, 2803GE, 6XE
Subtask 29-22-51-790-055
E. Leak Test of the Hydraulic Connections of the Ram Air Turbine
(1) Remove the protective covers from the turbine blades.
(2) Remove the warning notice(s).
(3) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-002).
(4) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(5) Examine the hydraulic connections of the RAT and make sure that there are no leaks.
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-51Page 437 1301-399, 401-499, 1Config-1 Aug 01/05 1 1 1CES 1 Subtask 29-22-51-860-099
F. Preparation for the Test
(1)
Remove the container from below the hydraulic connections and discard any spilt fluid.
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Retract the RAT (Ref. TASK 29-22-00-869-006). Subtask 29-22-51-710-056
G.
Do the operational and the functional test of the RAT (Ref. TASK 29-22-00-720-004).
5. Close-up
________
(Ref. Fig. 404/TASK 29-22-51-991-024) Subtask 29-22-51-864-069
A. Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
Subtask 29-22-51-410-062
B. Close Access
(1)
Apply SEALANTS (Material No. 09-018) to the contact area of the sidewall panel (4).