• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:43来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 

 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
R R R  - set the reservoir-filling manual selector-valve 1134GQ to BLUE 
30. Use the hydraulic ground-service cart or the hand pump to put fluid into the reservoir of the Blue hydraulic system until all the warnings go off
 31. Open the circuit breaker 1832GQ 
32. On the ground service panel of the Blue hydraulic system: 
R R  - carefully open the reservoir drain valve, 
R R R R R  - control the flow of fluid and let the content of the reservoir decrease slowly. 
R R R 
33. On the ground service panel of the Blue hydraulic system:
 - let the reservoir drain valve go back to the closed position.

-
the blue indicator light comes on,

-
the indicator shows the fluid quantity of the reservoir of the Blue hydraulic system


The usual low-level warning system is inoperative
-the fluid quantity of the reservoir decreases.
When the fluid quantity indicator 1834GQ on the Green ground service panel, or the quantity indicator of the reservoir shows the fluid quantity 1.8 l (0.48 US gal): - on the ECAM lower DU:
* the color of the fluid quantity
indication changes from green to
amber

 - on the ECAM upper DU:
 * the message HYD-B RSVR LO LVL and related actions come on.
 -the single chime audio warning operates.
 - on the glareshield panels 130VU and 131VU:
 * the MASTER CAUT lights come on.
-the flow of fluid from the reservoirstops.


 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
34.
 Use the hydraulic ground-service
 cart or the hand pump to put
 fluid into the reservoir of the
 Blue hydraulic system until the
 warnings on the ECAM displays go
 off


 35.
 On the ground service panel of  On the reservoir indicator:
 the Green hydraulic system:

 

 -set the reservoir-filling - the blue indicator light goes off, R manual selector-valve to - the indicator gives no indication of R NEUTRAL the fluid quantity of the reservoirs
 36. Close the circuit breaker 1832GQ  The usual low-level warning system is operative.
 5. Close-up
________
 Subtask 29-31-00-860-050
 A. Put the aircraft back to the serviceable condition.
 (1)
 Disconnect the hose and the adapter from the drain valve of the reservoir of the Blue hydraulic system.

 (2)
 Remove the container.

 (3)
 Stop the supply of air but do not disconnect the supply from the ground connector 1391GM.

 (4)
 On the ground service panel of the Green hydraulic system, set the reservoir-filling manual selector-valve to BLUE.

 (5)
 Use the hydraulic ground-service cart or the hand pump and fill the reservoir of the Blue hydraulic system to the same level as before the test.

 (6)
 On the ground service panel of the Green hydraulic system, set the reservoir selector valve to YELLOW.

 (7)
 Fill the reservoir of the Yellow hydraulic system to the same level as before the test.

 (8)
 On the ground service panel of the Green hydraulic system, set the
 reservoir-filling manual selector-valve to GREEN.


 (9)
 Fill the reservoir of the Green hydraulic system to the same level as before the test.

 


 (10)
 On the ground service panel of the Green hydraulic system, set the reservoir-filling manual selector-valve to NEUTRAL.

 (11)
 Make sure that all three reservoirs are pressurized to 50 psig. If necessary, use the air supply to fill them to the correct pressure.

 (12)
 Set the ground connector 1391GM to the CLOSE position and disconnect the FILL UNIT - AIR (98D29003501000).

 (13)
 Disconnect the hydraulic fluid supply as follows;


 (a) If a hydraulic ground-service cart was used: 1 Disconnect the hose from the fill connection 1007GM.
_
 2 Install the blanking cap on the fill connection.

_

 (b) If the hand pump 1009GM was used: 1 Remove the hand pump lever 3270GM from the hand pump.
_ 2 Retract the hand pump lever and put it in its position in the
_ ground service panel of the Yellow hydraulic system.
 3 Disconnect the flexible hose 1699GM from the reservoir fill
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压6(127)