 A. Put the aircraft back to the serviceable condition.
 (1)
 On the overhead panel 50VU, push the B/LEAK MEASUREMENT VALVES P/BSW. Make sure that the OFF light goes out.

 (2)
 Do the EIS stop procedure
 (Ref. TASK 31-60-00-860-002).


 (3)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-

 


002).

 

 TASK 29-32-00-710-003
 Operational Test of the System Pressure Switch (3151GN), Pressure Transmitter (3065GN) and the associated Indicating System of the Yellow Hydraulic System WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001  Fill the Hydraulic Fluid Reservoir with a Hand Pump
 12-12-29-611-002  Fill the Hydraulic Fluid Reservoir with a Hydraulic
 Service Cart
 24-41-00-861-002  Energize the Aircraft Electrical Circuits from the
 External Power
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied
 from the External Power
 29-00-00-910-002  Safety Procedures of the Hydraulic System
 29-10-00-863-002  Pressurize the Yellow Hydraulic System
 29-10-00-864-002  Depressurize the Yellow Hydraulic System
 29-14-00-614-002  Pressurization of the Hydraulic Reservoirs through
 the Ground Connector
 29-23-00-860-001  Disconnection of the Isolation Coupling of the Power
 Transfer Unit (PTU)
 29-23-00-860-002  Connection of the Isolation Coupling of the Power
 Transfer Unit (PTU)
 29-23-00-863-002  Pressurize the Yellow Hydraulic System from the Green
 Hydraulic System through the PTU with the Ground
 Service Cart
 29-23-00-864-001  Depressurize the Green and Yellow Hydraulic Systems
 after Operation of the PTU
 29-24-00-863-001  Pressurize the Yellow Hydraulic System with the
 Electric Pump
 29-24-00-864-001  Depressurize the Yellow Hydraulic System
 31-60-00-860-001  EIS Start Procedure
 31-60-00-860-002  EIS Stop Procedure

 

 3. Job Set-up
__________
 Subtask 29-32-00-865-052
 A. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/HYD/PRESS/XMTR 1841GN C11 121VU HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST 1881GP N35
 Subtask 29-32-00-860-055
 B. Aircraft Maintenance Configuration
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 (1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
 NOTE : This procedure pressurizes the Green hydraulic system together
____ with the Yellow hydraulic system. If you do not want to pressurize the Green system, you must disconnect the PTU isolation coupling.
 (2)
 If required, disconnect the PTU isolation coupling (Ref. TASK 29-23-00-860-001).

 (3)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (4)
 On the overhead panel 50VU, make sure that the HYD /LEAK MEASUREMENT VALVES/B pushbutton switch (P/BSW) is set to on (OFF light is not on).

 (5)
 Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).

 (6)
 On the ECAM control panel on the center pedestal, press the HYD pushbutton. Make sure that the ECAM lower display unit (DU) shows the HYD page.

 (7)
 Make sure that the ECAM shows none of these conditions:

 -
Yellow reservoir low air pressure,

 -
Yellow reservoir low fluid contents.

 

 (8)
 In addition, if you have not isolated the PTU, make sure that the ECAM does not show:

 -
low air pressure in the reservoir of the Green hydraulic system,

 -
low fluid contents in the reservoir of the Green hydraulic system.

 

 (9)
 If necessary, pressurize the reservoir(s) (Ref. TASK 29-14-00-614-002).
 