R R (6) Make sure that the CONTAINER 3 L(3/4 USGAL) is in position below the location of the hydraulic pressure transducer.
Subtask 29-32-11-865-059
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/HYD/PRESS/XMTR 1841GN C11
4. Procedure_________
(Ref. Fig. 402/TASK 29-32-11-991-002)
Subtask 29-32-11-420-054
R A. Installation of the Hydraulic Pressure Transducer
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Lubricate the new O-ring (5) with HYDRAULIC FLUIDS (Material No. 02-003).
(4) Remove the blanking plugs from the ports of the manifold (6).
R R (5) Put the new O-ring (5) in position on the hydraulic pressure transducer (2).
R R (6) Hold the hydraulic pressure transducer (2) in position on the manifold (6) and install the two bolts (3) and the washers (4).
(7) TORQUE the bolts (3) to between 0.40 and 0.50 m.daN (35.39 and 44.24 lbf.in).
R R (8) Install the clamp (11), the bonding jumper (9), the screw (10), the washer (8) and the nut (7) at the hydraulic pressure transducer (2) (Ref. TASK 20-28-00-912-004).
(9) Remove the blanking cap from the electrical connector (1).
(10) Make sure that the electrical connectors are clean and in the correct condition.
(11)
Connect the electrical connector (1).
Subtask 29-32-11-865-055
B.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1841GN
Subtask 29-32-11-790-051
C. Leak Test of the Hydraulic Connections
(1)
Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-002).
(2)
Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
R (3) Examine the connection of the hydraulic pressure transducer and make R sure that there are no leaks.
(4)
Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003). Subtask 29-32-11-710-051
D.
Do the operational test of the hydraulic pressure-indicating system (Ref. TASK 29-32-00-710-002).
5. Close-up
________
Subtask 29-32-11-860-059
A. Put the aircraft back to the serviceable condition.
(1) Remove the container.
(2)
Remove the warning notice(s).
Subtask 29-32-11-410-051
B.
Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the access panel 195BB.
TASK 29-32-11-000-003
R Removal of the Hydraulic Pressure Transducer (3065GN)
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING_______ GEAR.
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
RR R R R No specific No specific No specific No specific No specific circuit breaker(s) safety clip(s) 1 CAP - BLANKING 1 CONTAINER 3 L(3/4 USGAL) 2 PLUG - BLANKING 2 WARNING NOTICE
B. Referenced Information
中国航空网 www.aero.cn
航空翻译 www.aviation.cn