(13)
Install the tee-fitting (17) to the port D. Do not fully tighten the tee-fitting at this time.
(14)
Connect the pipe end-fitting (13) to the port B. Do not fully tighten the pipe end-fitting at this time.
(15)
Connect the pipe end-fitting (12) to the port C. Do not fully tighten the pipe end-fitting at this time.
(16)
Connect the pipe end-fitting (14) to the port A. Do not fully tighten the pipe end-fitting at this time.
(17)
Connect the end-fitting (16) and the hose (15) to the tee-fitting (17). Do not fully tighten the end-fitting (16) at this time.
(18)
Connect the pipe end-fitting (18) to the tee-fitting (17). Do not fully tighten the end fitting at this time.
(19)
Fully tighten the nuts (3),(22).
(20)
TORQUE the union nut of the tee-fitting (17) to between 7.5 and 8.3 m.daN (55.30 and 61.20 lbf.ft).
(21)
TORQUE the pipe end-fitting (13) to between 12.9 and 14.2 m.daN
(95.13 and 104.71 lbf.ft).
(22)
TORQUE the pipe end-fitting (12) to between 2.9 and 3.2 m.daN (21.38 and 23.59 lbf.ft).
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-52Page 410 1 1 May 01/05 1 1 1CES 1
(23)
TORQUE the pipe end-fitting (14) to between 9.7 and 10.7 m.daN (71.53 and 78.90 lbf.ft).
(24)
TORQUE the union nut (16) to between 7.5 and 8.3 m.daN (55.30 and
61.20 lbf.ft).
(25)
TORQUE the pipe end-fitting (18) to between 1.5 and 1.7 m.daN (11.06 and 12.53 lbf.ft).
(26)
Connect the end-fitting (9) and the hose (7) to the ground check module (8).
(27)
TORQUE the end-fitting (9) to between 12.9 and 14.2 m.daN (95.13 and
104.71 lbf.ft).
(28)
Remove the blanking caps from the electrical connector (1) and the receptacle (2).
(29)
Connect the electrical connector (1) to the receptacle (2). Subtask 29-22-52-865-052
B.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2801GE, 2803GE, 6XE.
Subtask 29-22-52-860-053
C. Preparation for the Test
(1)
Make sure that the level of the fluid in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).
(2)
Remove the warning notice(s).
(3)
Make sure that the work area is clean and clear of tool(s) and other items.
(4)
Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-002).
(5)
Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-52Page 411 1 1 May 01/05 1 1 1CES 1 Subtask 29-22-52-210-051
D. Leak Test of the Hydraulic Connections
(1) Examine the hydraulic connections of the ground check module and make sure that there are no leaks.
(2)
Remove the container from below the hydraulic connections. Subtask 29-22-52-710-050
E.
Do the operational and the functional test of the RAT (Ref. TASK 29-22-00-720-001).
5. Close-up
________ Subtask 29-22-52-860-052
A. Put the aircraft back to the serviceable condition.
(1)
Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
(2)
Close the access door 195BB.
(3)
Remove the safety barriers.
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-52Page 412 1 1 May 01/05 1 1 1CES 1 JACK - EJECTION, RAT (2454GE) - REMOVAL/INSTALLATION
____________________________________________________ R **ON A/C 001-049, 051-061, 101-105, 201-203,
TASK 29-22-53-000-001 Removal of the RAT Ejection Jack (2454GE) WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1.
Reason for the Job