• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:24来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


AIRPLANES WITH LATCH OPEN SWITCH
Cargo Door Sequence Switches Figure 401 (Sheet 6)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-34-09
 ALL  ú ú 02 Page 407 ú Feb 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 934-012
 (3)  
Identify the wires with a label for installation.

 S 024-004

 (4)  
Remove the switch mounting nuts.

 S 024-010

 (5)  
Remove the switch from the switch bracket.


 TASK 52-34-09-404-005
 3. Sequence Switches - Installation
________________________________
 A. References
 (1)  
52-34-00/501, Forward/Aft Cargo Door

 (2)  
IPC 52-34-09

 (3)  
SSM 52-34-01, 52-35-01

 (4)  
WDM 52-34-11, 52-35-11

 B.
Access

 (1)  
Location Zone
 122 Forward Cargo Container, Forward Half
 142 Aft Cargo Container Compartment


 (2)  
Access Panel
 821R Door - Forward Cargo Compartment
 822R Door - Aft Cargo Compartment


 C.
Procedure


 S 424-006
 (1)  
Put the sequence switch in its position in the switch bracket (Fig. 401).

 S 024-011

 (2)  
Install the switch mounting nuts.

 S 434-007

 (3)  
Connect the wires.

 (4)  
Adjust the switch (Ref 52-34-00/501).

 S 864-009

 (5)  
Remove the DO-NOT-CLOSE tags and close these circuit breakers for the applicable cargo door:

 (a)  
P414 Power Distribution Center - Left 1) 414F15 CARGO DOOR CONTROL FWD 2) 414F16 CARGO DOOR CONTROL AFT


 S 824-008
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-34-09
 ALL  ú ú 01 Page 408 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 CARGO DOOR SEQUENCE SWITCHES - INSPECTION/CHECK
_______________________________________________
 1.  General_______
 A.  This procedure contains a task to do a functional check of the forward/aft cargo door system electrical components and circuitry.
 TASK 52-34-09-726-004
 2.  Do a Functional Check of the Forward/Aft Cargo Door System Electrical_____________________________________________________________________ Components and Circuitry (Fig. 601)________________________
 A.  Standard Tools and Equipment
 (1)  
Multimeter - to measure electrical continuity

 B.  
References

 (1)  
52-34-00/001, Forward/Aft Cargo Door

 C.  
Access

 (1)  
Location Zone 122 Forward Cargo Container Compartment, Forward Half 142 Aft Cargo Container Compartment

 (2)  
Access Panel
 821R Door - Forward Cargo Compartment
 822R Door - Aft Cargo Compartment


 D.  
Procedure


 S 866-005
 (1)  
Make sure the cargo door is in the closed and latched position.

 S 866-001

 (2)  
Open circuit breakers as follows for the applicable cargo door.

 (a)  
P59 Aft Equipment Panel
 1) AFT CARGO DOOR POWER UNITS


 (b)  
P414 Power Distribution Center - Left 1) 414A21 LOWER CARGO DOOR FORWARD 2) 414F15 CARGO DOOR CONTROL FORWARD 3) 414F16 CARGO DOOR CONTROL AFT


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-34-09
 ALL  ú ú 01 Page 601 ú Jun 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

DOOR UP
SWITCH


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 3(81)