C. Access
(1)
Location Zone 122 Forward Cargo Container Compartment, Forward Half 142 Aft Cargo Container Compartment
(2)
Access Panel
821R Door - Forward Cargo Compartment
822R Door - Aft Cargo Compartment
D.
Procedure
S 644-022
(1)
Lubricate the hinge pins with grease.
S 424-023
(2)
Install the hinge pins in the hinge section.
S 394-032
(3)
Fay seal the hinge and the structure it will attach to.
S 424-019
(4)
Put the hinge section in its position, with the hinge pin and shims installed (View A-A and B-B, Fig. 401).
NOTE: This will align the holes in each hinge segment with the
____
mating holes in the door and fuselage.
Make sure the shims are installed in the same initial position.
S 434-011
(5)
Install the bolts.
(6)
Tighten the center hinge nuts 65 to 90 pound-inches.
(7)
Tighten the end hinge nuts 130 to 180 pound-inches.
S 424-028
S 434-025
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-34-08
ALL ú ú 03 Page 405 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(8) S 394-033Fillet seal the perimeter of the hinge.
(9) S 214-030Make sure the BACJ40AB22-7 jumper cable is correctly installed.
S 414-012
(10)
Install the doorway ceiling panel (Ref 25-52-01/401).
S 434-013
(11)
Install the rain seal on the cargo door (Ref 52-09-03/401).
S 414-014
(12)
Put the top door lining in its position and install the necessary fasteners.
S 434-015
(13)
Install the cargo door junction box (Ref 52-34-05/401).
S 864-016
(14)
Remove the DO-NOT-CLOSE tags and close these circuit breakers for the applicable cargo door:
(a)
P59 Aft Equipment Panel 1) AFT CARGO DOOR POWER UNITS
(b)
P414 Power Distribution Center - Left 1) 414A21 LOWER CARGO DOOR FWD 2) 414F15 CARGO DOOR CONTROL FWD 3) 414F16 CARGO DOOR CONTROL AFT
S 414-017
(15) Close the cargo door.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-34-08
ALL ú ú 01 Page 406 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
CARGO DOOR SEQUENCE SWITCHES - REMOVAL/INSTALLATION
___________________________________________________
1. General_______
A. This procedure contains two tasks:
(1)
The first task is the removal of a sequence switch from the cargo door.
(2)
The second task is the installation of a sequence switch on the cargo door.
B.
The sequence switches on the cargo door are as follows:
-
The midspan latch open switches
-
The hook close switch
-
The master latch lock switch
-
The door close switch
-
The latch close switch
-
The hook position switch
-
The door up switch
C.
You can use this procedure for all types of sequence switches.
TASK 52-34-09-004-001
2. Sequence Switch - Removal_________________________
A. References
(1)
IPC 52-34-09
(2)
SSM 52-34-01, 52-35-01
(3)
WDM 52-34-11, 52-35-11
B.
Access
(1)
Location Zone 122 Forward Cargo Container Compartment, Forward Half 142 Aft Cargo Container Compartment
(2)
Access Panel
821R Door - Forward Cargo Compartment
822R Door - Aft Cargo Compartment
C.
Procedure
中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 3(79)