• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-12 10:37来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

ACCUMULATOR SEE A
DIRECT READING PRESSURE GAGE GAS CHARGING VALVE
CAP
MANIFOLD
PRESSURE 
LINE  NUT  HYDRAULIC BRAKE ACCUMULATOR 
CHARGING EQUIPMENT INSTALLATION 
MOUNTING 
BRACKET  A 

SPACER WASHER
WASHER SCREW
DIRECT READING
SHIELD PRESSURE GAGE
PRESSURE GAGE ASSEMBLY B Hydraulic Brake Accumulator Direct Reading Pressure Gage Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-41-11
 ALL  ú ú 01 Page 402 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 844-034
 (3)  
If necessary, release the parking brake. S 494-023

 CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.

 (4)  
Do this task: "Installation of the Door Locks on the Wing Landing Gear" (AMM 32-00-30/201).

 S 494-024

 (5)  
Do this task: "Installation of the Door Locks on the Body Landing Gear" (AMM 32-00-30/201).

 S 844-036

 (6)  
Supply electrical power (AMM 24-22-00/201).

 S 844-006

 (7)  
Remove the pressure from hydraulic system 4 (AMM 29-11-00/201).

 S 684-007

 (8)  
Do these steps to remove the hydraulic fluid from the accumulator:

 (a)  
Look at the pressure indication of the HYD BRAKE PRESS gage on the Captain's Main Instrument Panel, P1.

 (b)  
Slowly push one set of brake pedals to the limit of travel, hold momentarily, and then release. Repeat this cycle 10 times. 1) Make sure the pressure indication of the HYD BRAKE PRESS


 WARNING:_______ YOU MUST CAREFULLY DO THE STEPS IN THE TASK BELOW TO INSTALL
 THE DOOR LOCKS ON THE LANDING GEAR DOORS.  THE DOORS CAN CLOSE
 QUICKLY IF YOU DO NOT INSTALL THE DOOR LOCKS CORRECTLY.  THIS

 gage decreases during manual brake operation.
 2)  After the 10 cycles of manual brake operation, make sure the HYD BRAKE PRESS gage shows no more decrease in pressure.
 S 844-008
 (9)  
Do these steps to release the gas from the hydraulic brake accumulator:

 (a)  
Remove the cap from the stem of the gas charging valve.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-41-11
 ALL  ú ú 01 Page 403 ú Oct 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 WARNING:_______DO NOT LOOSEN THE BODY OF THE GAS CHARGING VALVE. THE PRESSURE IN THE ACCUMULATOR CAN QUICKLY PUSH THE GAS CHARGING VALVE OFF THE MANIFOLD. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (b)  
Turn the outer nut of the gas charging valve one turn counterclockwise to release the gas pressure from the accumulator.

 (c)  
Make sure the pressure indication of the direct reading pressure gage goes to zero.

 E.
Procedure


 S 024-009
 (1)  
Do these steps to remove the pressure gage:

 (a)  
Loosen nuts on the tube between the manifold and the pressure gage.

 (b)  
Disconnect the tube from the pressure gage.

 (c)  
Put a cap on the pressure gage and the tube fittings.

 (d)  
Remove the four bolts to remove the pressure gage from the mounting bracket.

 (e)  
Remove the screws, shield and spacers from the pressure gage.


 TASK 32-41-11-404-010
 3.  Brake Accumulator Direct Reading Pressure Gage Installation (Fig. 401)___________________________________________________________
 A. General
 (1)  
In subsequent steps, the hydraulic brake accumulator direct reading pressure gage is referred to as the pressure gage.

 B.
Consumable Materials

 (1)  
G01158 Nitrogen, Gaseous (Dry, Commercial
 Grade, 99.9 percent pure)


 (2)  
If nitrogen is not available,
 Source of Clean Dry Air, maximum moisture
 content corresponding to an atmospheric dew
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 6(81)