747-400
MAINTENANCE MANUAL
TUBING TO THE
HYDRAULIC BRAKE
ACCUMULATOR
DIRECT READING
PRESSURE GAGE GAS
HYDRAULIC BRAKE CHARGING
ACCUMULATOR CHARGING VALVE
EQUIPMENT INSTALLATION
SEE A
HYDRAULIC BRAKE ACCUMULATOR
CHARGING EQUIPMENT INSTALLATION
A
O-RING GAS
CHARGING
VALVE
MANIFOLD
CAP
MANIFOLD ASSEMBLYB
Hydraulic Brake Accumulator Gas Charging Valve Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-41-10
ALL ú ú 01 Page 402 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
S 494-023
WARNING:_______ YOU MUST CAREFULLY DO THE STEPS IN THE TASK BELOW TO INSTALL
THE DOOR LOCKS ON THE LANDING GEAR DOORS. THE DOORS CAN CLOSE
QUICKLY IF YOU DO NOT INSTALL THE DOOR LOCKS CORRECTLY. THIS
CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
(4)
Do this task: "Installation of the Door Locks on the Wing Landing Gear" (AMM 32-00-30/201).
S 494-024
(5)
Do this task: "Installation of the Door Locks on the Body Landing Gear" (AMM 32-00-30/201).
S 844-031
(6)
Supply electrical power (AMM 24-22-00/201).
S 864-006
(7)
Remove the pressure from hydraulic system 4 (AMM 29-11-00/201).
S 864-007
(8)
Do these steps to remove the hydraulic fluid from the hydraulic brake accumulator:
(a)
Look at the pressure indication of the HYD BRAKE PRESS gage on the Captain's Main Instrument Panel, P1.
(b)
Slowly push one set of brake pedals to the limit of travel, hold momentarily, and then release. Repeat this cycle 10 times. 1) Make sure the pressure indication of the HYD BRAKE PRESS
gage decreases during manual brake operation.
2) After the 10 cycles of manual brake operation, make sure the HYD BRAKE PRESS gage shows no more decrease in pressure.
S 844-008
(9)
Do these steps to release the gas from the hydraulic brake accumulator:
(a)
Remove the cap from the stem of the gas charging valve.
WARNING:_______DO NOT LOOSEN THE BODY OF THE GAS CHARGING VALVE. THE PRESSURE IN THE ACCUMULATOR CAN QUICKLY PUSH THE GAS CHARGING VALVE OFF THE MANIFOLD. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
(b)
Turn the outer nut of the charging valve one turn counterclockwise to release the gas from the hydraulic brake accumulator.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-41-10
ALL ú ú 01 Page 403 ú Oct 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(c)
Make sure the pressure indication of the direct reading pressure gage goes to zero.
E.
Procedure
S 034-032
(1)
Remove the lockwire from the gas charging valve.
S 024-033
(2)
Turn the body of the gas charging valve counterclockwise to remove the gas charging valve from the manifold.
S 034-034
(3)
Remove and discard the O-ring.
TASK 32-41-10-404-010
3. Hydraulic Brake Accumulator Gas Charging Valve Installation (Fig. 401)
___________________________________________________________
A. General
(1)
In subsequent steps, the hydraulic brake accumulator gas charging valve is referred to as the gas charging valve.
B.
Consumable Materials
(1)
G01158 Nitrogen, Gaseous (Dry, Commercial
Grade, 99.9 percent pure)
(2)
If nitrogen is not available,
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 6(78)