32-36-02
 ALL  ú ú 01 Page 403 ú Oct 10/91 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL 
BOLT (4 LOCATIONS) 
A 
SUPPORT ASSEMBLY 
A 
UNLOCK SWITCH 
ACTUATOR 
UPLOCK RELEASE MECHANISM 
C 
33 
2 
2 
A-A
2  0.004 INCH CLEARANCE (MAXIMUM). 
THE CLEARANCE CAN OCCUR AT THE 
TOP OR THE LOWER SURFACE OF THE 
BUSHING.
3 
REFERENCE ONLY. FOR SPECIFIC 
PART NUMBER, LENGTH AND MATERIAL 
REFER TO CURRENT AIPC.
Alternate Extension System for the Wing Gear Figure 401 (Sheet 2) 
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-36-02
 ALL  ú ú 01 Page 404 ú Feb 18/02 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 TASK 32-36-02-404-005
 3. Installation of the Uplock Release Mechanism for the Wing Gear
______________________________________________________________
 A. References
 (1)  
32-36-01/401, Wing Gear Alternate Extension System Electric Actuator
 (2)  
32-36-02/501, Wing Gear Alternate Extension System Uplock Release Mechanism
 (3)  
IPC 32-36-02 Fig. 1
 (4)  
SSM 32-35-02
 (5)  
WDM 32-35-12
 B. 
Access
 (1)  
Location Zones
 135 Wing Landing Gear Wheel Well, LH
 136 Wing Landing Gear Wheel Well, RH
 C. 
Installation of the Uplock Release Mechanism (Fig. 401)
 S 424-016
 (1)  Put the uplock release mechanism in its position on the structure and install the fasteners.
 NOTE: Make sure the maximum clearance at the top or the lower
____ surface of the bushing is not more than 0.004 inches (View A-A, Fig. 401).
 S 434-019
 (2)  
Connect the door unlock switch at junction box J71 (J72 RH side) and connect the electrical cable clamps.
S 434-017
 (3)  
Connect the cables for alternate extension of the wing gear, LGDR-3A and -3B (LGDR-4A and -4B, RH), to the cable quadrant in the uplock release mechanism.
 S 824-018
 CAUTION: MAKE SURE THE INTERNAL TEMPERATURE OF THE AIRPLANE STAYED WITH
_______ 10°F OF THE EXTERNAL TEMPERATURE FOR A MINIMUM OF 1 HOUR BEFORE YOU ADJUST THE CABLES.
 (4)  
Adjust the tension the cables LGDR-3A and -3B (LGDR-4A and -4B, RW) to the value shown in Fig. 402.
S 414-007
 (5)  
Install the electrical actuator for alternate extension of the left (right) wing gear (Ref 32-36-01/401).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-36-02
 ALL  ú ú 01 Page 405 ú Oct 10/91 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
747-400 
MAINTENANCE MANUAL
CABLE TENSION (POUNDS)
120 
110 
100 
90 
80 
70 
60 
50 
40
AMBIENT TEMPERATURE (`F) 
Cable Tension for the Alternate Extension System Figure 402 
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-36-02
 ALL  ú ú 01 Page 406 ú Oct 10/91 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 S 714-008
 (6)  Do a test of the uplock mechanism for alternate extension of the left (right) wing gear and put the airplane back to its usual condition (Ref 32-36-02/501).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-36-02
 ALL  ú ú 01 Page 407 ú Oct 10/91 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 6(3)