• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-12 10:37来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A
747-400 MAINTENANCE MANUAL
 S 844-051
 (3) Remove electrical power, if it is not necessary (AMM 24-22-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-41-09
 ALL  ú ú 01 Page 409 ú Oct 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 HYDRAULIC BRAKE ACCUMULATOR - INSPECTION/CHECK
______________________________________________
 1.  General_______
 A.  This procedure does a check of the pressure indication devices at the hydraulic brake accumulator.
 TASK 32-41-09-706-014
 2.  Hydraulic Brake Accumulator Inspection/Check (Fig. 601)____________________________________________
 A.  References
 (1)  
AMM 09-11-00/201, Towing

 (2)  
AMM 24-22-00/201, Manual Control

 (3)  
AMM 29-11-00/201, Main Hydrualic Supply System

 (4)  
AMM 31-61-00/001, Integrated Display System

 (5)  
AMM 32-00-30/201, Landing Gear Door Locks

 (6)  
AIPC 32-41-09 Fig. 1

 B.  
Access

 (1)  
Location Zone
 138 Body Landing Gear Well - Right
 221 Control Cabin, LH


 C.  
Prepare for the Inspection/Check


 S 866-023
 (1)  
Make sure the landing gear ground locks are installed (AMM 09-11-00/201).

 S 866-024

 (2)  
Make sure the wheel chocks are installed.


 S 496-017
 WARNING: YOU MUST CAREFULLY DO THE STEPS IN THE TASK BELOW TO INSTALL
_______ THE DOOR LOCKS ON THE LANDING GEAR DOORS. THE DOORS CAN CLOSE QUICKLY IF YOU DO NOT INSTALL THE DOOR LOCKS CORRECTLY. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (3)  Do this task: "Installation of the Door Locks on the Wing Landing Gear" (AMM 32-00-30/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-41-09
 ALL  ú ú 01 Page 601 ú Jun 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

TUBING TO THE 
HYDRAULIC BRAKE 
ACCUMULATOR 
HYDRAULIC BRAKE ACCUMULATOR 
CHARGING EQUIPMENT INSTALLATION 
SEE  A  DIRECT READING 
PRESSURE GAGE  GAS 
CHARGING 
VALVE 

HYDRAULIC BRAKE ACCUMULATOR CHARGING EQUIPMENT INSTALLATION
A
P1-4 PANEL SEE B
HYD BRAKE HYDRAULIC
PRESS
BRAKE  BRAKE
SOURCE
PSI X 1000
PRESSURE GAGE
P1-4 PANEL B
Hydraulic Brake Accumulator Inspection
Figure 601

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-41-09
 ALL  ú ú 01 Page 602 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 496-022
 (4)  
Do this task: "Installation of the Door Locks on the Body Landing Gear" (AMM 32-00-30/201).

 S 846-003

 (5)  
Supply electrical power (AMM 24-22-00/201).

 D.
Procedure


 S 866-018
 WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF ALL CONTROL
_______ SURFACES BEFORE YOU SUPPLY HYDRAULIC POWER. AILERONS, RUDDERS, ELEVATORS, FLAPS, SPOILERS, LANDING GEAR, AND THRUST REVERSERS CAN MOVE QUICKLY WHEN YOU SUPPLY HYDRAULIC POWER. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
 (1)  
Pressurize hydraulic system 4 (AMM 29-11-00/201).

 S 716-026

 (2)  
Do these steps to do a check of the pressure indication devices at the hydraulic brake accumulator:

 (a)  
Make sure the pressure indication for hydraulic system 4 on the EICAS hydraulic synoptic display is 2900-3150 psi (AMM 31-61-00/001).


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 6(76)