R  (e) On panel 800VU: 
R  - put the applicable wing tank REFUEL VALVES switch to the SHUT 
R  position 
R  - make sure that the fuel-flow from the water drain valve 
R  decreases and stops. 
R  (f) Close the water drain valve (Ref. TASK 28-25-00-650-003) and 
R  remove the PURGING TOOL. 

R 1EFF : 301-399, 1 57-27-11Page 456 1 1 May 01/04 1 1 1CES 1


R  (g) Put a container on the access platform below the applicable NACA 
R  vent in the surge tank. 
R  (h) On the panel 800VU: 
R  - put the applicable wing tank REFUEL VALVES switch to the OPEN 
R  position 
R  - make sure that the opposite wing tank REFUEL VALVES switch is 
R  in the SHUT position 
R  - hold the TEST switch in the HI LVL position. 
R  (i) Set the fuel tanker to its lowest flow rate and pressure. Let 50l 
R  (13.2084 USgal) of fuel flow into the vent surge tank. Make sure 
R  that fuel flows out of the NACA vent. 
R  (j) On the panel 800VU: 
R  - put the applicable wing tank REFUEL VALVES switch to the SHUT 
R  position. 
R  (k) Stop the operation of the fuel tanker. 
R  (l) On the panel 800VU: 
R  - release the TEST switch from the HI LVL position 
R  - make sure that the applicable HI LVL light comes on 
R  - put all of the REFUEL VALVES switches to the NORM and guarded 
R  position 
R  - put the MODE SELECTOR switch to the OFF and guarded position. 
R  (5) If the access panel 550BB(650BB) has been removed, do the steps that 
R  follow: 
R  (a) Refuel the applicable wing tank fully and keep the fuel tanker 
R  connected to the aircraft (Ref. TASK 12-11-28-650-003). 
R  (b) Put a container on the access platform below the applicable water 
R  drain valve 21QM (22QM). Use the PURGING TOOL (97A28002117002) to 
R  open the water drain valve (Ref. TASK 28-25-00-650-003). 
R  (c) On panel 800VU: 
R  - put the MODE SELECT switch to REFUEL 
R  - put the applicable wing tank REFUEL VALVES switch to the OPEN 
R  position 
R  - put the opposite wing tank REFUEL VALVES switch to the SHUT 
R  position 
R  - put the TEST switch to the HI LVL position and hold it there 
R  - make sure that the applicable HI LVL light goes out. 

R 1EFF : 301-399, 1 57-27-11Page 457 1 1 May 01/04 1 1 1CES 1


R  (d) Set the fuel tanker to its lowest flow-rate and pressure. Make 
R  sure that the fuel flows into the vent surge tank and out of the 
R  water drain valve 21QM (22QM) (Ref. TASK 28-25-00-650-003). 
R  (e) On panel 800VU: 
R  - put the applicable wing tank REFUEL VALVES switch to the SHUT 
R  position 
R  - make sure that the fuel-flow from the water drain valve 
R  decreases and stops. 
R  (f) Close the water drain valve (Ref. TASK 28-25-00-650-003) and 
R  remove the PURGING TOOL. 
R  (g) Put a container on the access platform below the applicable NACA 
R  vent in the surge tank. 
R  (h) On the panel 800VU: 
R  - put the applicable wing tank REFUEL VALVES switch to the OPEN 
R  position 
R  - make sure that the opposite wing tank REFUEL VALVES switch is 
R  in the SHUT position 
R  - hold the TEST switch in the HI LVL position. 
R  (i) Set the fuel tanker to its lowest flow rate and pressure. Let 100 
R  l (26.4169 USgal) of fuel flow into the vent surge tank. Make 
R  sure that fuel flows out of the NACA vent. 
R  (j) On the panel 800VU: 
R  - put the applicable wing tank REFUEL VALVES switch to the SHUT 
R  position. 
R  (k) Stop the operation of the fuel tanker. 
R  (l) On the panel 800VU: 
R  - release the TEST switch from the HI LVL position 
R  - make sure that the applicable HI LVL light comes on 
R  - put all of the REFUEL VALVES switches to the NORM and guarded 
R  position 
R  - put the MODE SELECT switch to the OFF and guarded position. 
R  (6) For the access panel 550CB(650CB), refer to (Ref. TASK 28-12-45-400-
R  002). 
 