(4)
Put the adjustable access platform in position below the applicable access panel to be removed.
Subtask 57-41-37-865-075
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06 121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
4. Procedure
_________ (Ref. Fig. 403/TASK 57-41-37-991-023) Subtask 57-41-37-020-056
A. Removal of the Access Panels NOTE : On many of the access panels, the screws that retain the panels
____ have different lengths. Make a record of the position of each screw as it is removed.
(1) For the panel 522FB(622FB):
(a)
Hold the panel (1). Remove the four screws (2) and the screws (3).
(b)
Carefully remove the panel (1).
1EFF : ALL 1 57-41-37Page 432 1 1 Aug 01/04R 1 1 1CES 1
INTENTIONALLY BLANK
R 1 1
57-41-37Page 433
1 1 Aug 01/04 1 1 1CES 1
Access Panels - Location and Detail Figure 403/TASK 57-41-37-991-023- 14 (SHEET 1)
1EFF : 1 1R 1CES ALL 1 11 1 57-41-37 Page 434 Aug 01/04
Access Panels - Location and Detail Figure 403/TASK 57-41-37-991-023- 24 (SHEET 2)
1EFF : 1 1R 1CES ALL 1 11 1 57-41-37 Page 435 Aug 01/04
Access Panels - Location and Detail Figure 403/TASK 57-41-37-991-023- 34 (SHEET 3)
1EFF : 1 1R 1CES ALL 1 11 1 57-41-37 Page 436 Aug 01/04
Access Panels - Location and Detail Figure 403/TASK 57-41-37-991-023- 44 (SHEET 4)
R 1EFF : 1 1 1CES ALL 1 111 57-41-37 Page 437 Aug 01/04
(2)
For the panel 522JB(622JB):
(a)
Hold the panel (4) and remove the screws (5).
(b)
Remove the bolt (6) from the lanyard and carefully remove the panel (4).
(3)
For the panel 522KB(622KB):
(a)
Hold the panel (7). Remove the three screws (8) and the screws (9).
(b)
Carefully remove the panel (7).
(4)
For the panel 522LB(622LB):
(a)
Hold the panel (10). Remove the three screws (11) and the screws (12).
(b)
Carefully remove the panel (10).
(5)
For the panel 522NB(622NB):
(a)
Hold the panel (13). Remove the five screws (14) and the screws (15).
(b)
Carefully remove the panel (13).
(6)
For the panel 522QB(622QB):
(a)
Hold the panel (16). Remove the five screws (17) and the screws (18).
(b)
Carefully remove the panel (16).
(7)
For the panel 522SB(622SB):
(a)
Hold the panel (19). Remove the four screws (20) and the screws (21).
(b)
Carefully remove the panel (19).
(8)
For the panel 522UB(622UB):
(a) Hold the panel (22). Remove the two screws (23) and the screws (24).
R 1EFF : ALL 1 57-41-37Page 438 1 1 Aug 01/04 1 1 1CES 1
(b) Carefully remove the panel (22).
1EFF : ALL 1 57-41-37Page 439 1 1 Aug 01/04R 1 1 1CES 1
TASK 57-41-37-400-006
Installation of the Access Panels 522FB(622FB), 522JB(622JB), 522KB(622KB), 522LB(622LB), 522NB(622NB), 522QB(622QB), 522SB(622SB), 522UB(622UB)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific adjustable access platform
No specific non-metallic scraper
No specific safety barriers
No specific warning notice
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINGS 机翼2(139)