• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 12:40来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (c)
 Install the bolts (25) and the nuts (24).

 (d)
 Tighten the nuts (21) and (24).

 

 (4)
 If you install the removed slat-track can 6, do these steps:

 (a)
 Put the bracket assembly (36) in position on the slat-track can (33).

 (b)
 Install the bolts (37) and the nuts (30).

 (c)
 Install the bolts (35) and the nuts (31).

 (d)
 Tighten the nuts (30) and (31).

 

 (5)
 Connect and tighten the drain pipe (17) to the slat-track can (16).


 1EFF : ALL 1 57-24-11Page 418 1 1 May 01/04R 1 1 1CES 1


 Subtask 57-24-11-420-057
 D. Installation of Slat-track Cans 7 and 8
 (Ref. Fig. 401/TASK 57-24-11-991-001-A, 404/TASK 57-24-11-991-004)

 (1)
 Apply a layer of SEALANTS (Material No. 09-005) to the seal faces of the slat-track can (31), the front spar and the bolts (33).

 (2)
 If you replace the slat-track can 7 or 8, do these steps: NOTE : It is not necessary to install the bracket assembly on the new


____
 slat-track can.

 (a)
 Install the new slat-track can (31) with the bolts (33). Make sure that you install the bolts (33) in the same positions from which you removed them.

 (b)
 Tighten the bolts (33).


 (3)
 To install the removed slat-track can (7), do these steps :

 (a)
 Put the bracket assembly (51) in position on the slat-track can (54).

 (b)
 Install the bolts (57) and the nuts (50).

 (c)
 Install the bolts (56) and the nuts (52).

 (d)
 Tighten the nuts (50) and (52).

 

 (4)
 To install the removed slat-track can (8), do these steps :

 (a)
 Put the bracket assembly (62) in position on the slat-track can (65).

 (b)
 Install the bolts (68) and the nuts (61).

 (c)
 Install the bolts (67) and the nuts (63).

 (d)
 Tighten the nuts (61) and (63).

 

 (5)
 Connect and tighten the drain pipe (32) to the slat-track can (31).


 1EFF : ALL 1 57-24-11Page 419 1 1 May 01/04R 1 1 1CES 1


 Subtask 57-24-11-420-058
 E. Installation of Slat-track Cans 9 and 10
 (Ref. Fig. 401/TASK 57-24-11-991-001-A, 404/TASK 57-24-11-991-004)

 (1)
 Apply a layer of SEALANTS (Material No. 09-005) to the seal faces of the slat-track can (46), the front spar and the bolts (48).

 (2)
 If you replace the slat-track can 9 or 10, do these steps: NOTE : It is not necessary to install the bracket assembly on the new


____
 slat-track can.

 (a)
 Install the new slat-track can (46) with the bolts (48). Make sure that you install the bolts (48) in the same positions from which you removed them.

 (b)
 Tighten the bolts (48).


 (3)
 To install the removed slat-track can 9, do these steps:

 (a)
 Put the bracket assembly (82) in position on the slat-track can (85).

 (b)
 Install the bolts (88) and the nuts (81).

 (c)
 Install the bolts (87) and the nuts (83).

 (d)
 Tighten the nuts (81) and (83).

 

 (4)
 To install the removed slat-track can 10, do these steps:

 (a)
 Put the bracket assembly (95) in position on the slat-track can (92).

 (b)
 Install the bolts (90) and the nuts (91).

 (c)
 Install the bolts (96) and the nuts (94).

 (d)
 Install the bolts (97).

 (e)
 Tighten the nuts (91) and (94).

 

 (5)
 Connect the drain pipe (47) to the slat-track can (46).


 1EFF : ALL 1 57-24-11Page 420 1 1 May 01/04R 1 1 1CES 1


 Subtask 57-24-11-420-059
 F. Installation of Slat-track Cans 11 and 12
 (Ref. Fig. 401/TASK 57-24-11-991-001-A, 405/TASK 57-24-11-991-005,
 406/TASK 57-24-11-991-006)

 (1)
 For the slat-track can 11, apply a layer of SEALANTS (Material No. 09-005) to the seal faces of the slat-track can (60), the front spar and the bolts (62).

 (2)
 If you replace the slat-track can 11, do these steps: NOTE : It is not necessary to install the bracket assembly on the new


____
 slat-track can.

 (a)
 install the slat-track can (60) with the bolts (62). Make sure that you install the bolts (62) in the same position from which you removed them.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINGS 机翼2(13)