(d)
Safety the nut (74):
-
for track 3 positions, use the new cotter pin (75) and/or the new cotter pin (76)
-
for track 4 positions, use the new cotter pin (77) and/or the new cotter pin (78)
-
for track 6 positions, use the new cotter pin (79) and/or the new cotter pin (80)
-
for track 7 positions, use the new cotter pin (81) and/or the new cotter pin (82)
-
for track 9 positions, use the new cotter pin (83) and/or the new cotter pin (84)
-
for track 10 positions, use the new cotter pin (85) and/or the new cotter pin (86)
-
for track 11 positions, use the new cotter pin (87) and/or the new cotter pin (88)
-
for track 12 positions, use the new cotter pin (89) and/or the new cotter pin (90).
(4)
Installation of the top vertical-load rollers at tracks 3, 4, 6, 7, 9, 10, 11 and 12. (Ref. Fig. 402/TASK 57-41-33-991-002)
(a)
Apply a thin layer of COMMON GREASE (Material No. 04-024) to the pin (111).
(b)
Install the roller (113) and the pin (111).
(c)
Make sure that:
-
the pin (111) is correctly engaged with the eccentric bush
-
the angled greaser points down and forward (tracks 6, 7, 9 thru 12 aft positions only).
1EFF : ALL 1 57-41-33Page 413 1 1 May 01/04R 1 1 1CES 1
(d)
Install and tighten the nut (95).
(e)
Safety the nut (95):
-
for track 3 positions, use the new cotter pin (96) and/or the new cotter pin (97)
-
for track 4 positions, use the new cotter pin (98) and/or the new cotter pin (99)
-
for track 6 positions, use the new cotter pin (100) and/or the new cotter pin (101)
-
for track 7 positions, use the new cotter pin (102) and/or the new cotter pin (103)
-
for track 9 positions, use the new cotter pin (104) and/or the new cotter pin (105)
-
for track 10 positions, use the new cotter pin (106) and/or the new cotter pin (107)
-
for track 11 positions, use the new cotter pins (108)
-
for track 12 positions, use the new cotter pin (109) and/or the new cotter pin (110).
Subtask 57-41-33-710-050
C. Test
(1)
Lubricate the applicable rollers with COMMON GREASE (Material No. 04-024).
(2)
Make sure that the rollers that you installed operate without play.
(3)
Remove all unwanted grease with a clean lint-free cloth or tissue.
5. Close-up
________
Subtask 57-41-33-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the applicable slat tracks:
-
for slat tracks 1 thru 4 (Ref. TASK 27-84-61-400-004)
-
for slat tracks 5 thru 12 (Ref. TASK 27-84-62-400-001).
1EFF : ALL 1 57-41-33Page 414 1 1 May 01/04R 1 1 1CES 1
(3) Install the applicable slats:
-
for the rollers at slat tracks 1, 2, 3, and/or 4, install slat No. 1 (Ref. TASK 27-84-63-400-002)
-
for the rollers at slat tracks 5 and/or 6, install slat No. 2 (Ref. TASK 27-84-64-400-002)
-
for the rollers at slat tracks 7 and/or 8, install slat No. 3 (Ref. TASK 27-84-65-400-002)
-
for the rollers at slat tracks 9 and/or 10, install slat No. 4 (Ref. TASK 27-84-66-400-002)
-
for the rollers at slat tracks 11 and/or 12, install slat No. 5 (Ref. TASK 27-84-67-400-002).
Subtask 57-41-33-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5CV, 7CV.
Subtask 57-41-33-942-050
C. Removal of Equipment
(1)
Remove the safety barriers.
(2)
Remove the warning notice(s).
(3)
Remove the access platform(s).
(4)
Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat control lever.
(5)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
1EFF : ALL 1 57-41-33Page 415 1 1 May 01/02R 1 1 1CES 1
ACCESS PANELS AND COVERS - REMOVAL/INSTALLATION
_______________________________________________
TASK 57-41-37-000-004
Removal of the Pressure-Relief Panels 521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINGS 机翼2(130)