R  (98D57004033000) 
R  - for the flap track beam 4, use the R/I TOOL FLAP BEARING 
R  (98D57004034000). 
R  (13) TORQUE the nut (4) as follows: 
R  - for the flap track 2, to between 9.5 and 10.5 m.daN (70.05 and 
R  77.43 lbf.ft) 
R  - for the flap track 3, to between 9.5 and 10.5 m.daN (70.05 and 
R  77.43 lbf.ft)

 

R  - for the flap track 4, to between 6.5 and 5.5 m.daN (47.93 and 40.56 
R  lbf.ft). 
R  (14) Release the applicable nut (4) after thirty minutes. 
R  (15) TORQUE the applicable nut (4) again, as specified in workstep (12). 
R  (16) Safety the nut (4) with the washer (3). 
R  (17) Apply SEALANTS (Material No. 09-002) to the parts that follow: 
R  - the interface of the nut (4) and the flap structure (2) 
R  - the interface of the bearing assembly (1) and the flap structure 
R  (2). 
R  Subtask 57-26-15-410-050-A 
R  C. Close Access 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) Install the applicable flap track beam: 
R  - for the flap track beam 2 (Ref. TASK 57-51-33-400-002) 
R  - for the flap track beam 3 (Ref. TASK 57-51-33-400-003) 
R  - for the flap track beam 4 (Ref. TASK 57-51-33-400-004). 
R  (3) Install the applicable fixed fairing access panels (Ref. TASK 57-55-
R  11-400-004): 
R  - for flap track 2, install 531AB, 531BB, 631AB, 631BB 
R  - for flap track 3, install 532AB, 532BB, 632AB, 632BB 
R  - for flap track 4, install 533AB, 533BB, 633AB, 633BB. 
R  (4) For the flap track beam 2: 
R  (a) Install the applicable inboard flap (Ref. TASK 27-54-61-400-003). 
R  (5) For the flap track beams 3 and 4: 
R  (a) Install the applicable outboard flap (Ref. TASK 27-54-62-400-
R  002).

 

R **ON A/C ALL


 Subtask 57-26-15-865-052
 D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6CV, 8CV.
 5. Close-up
________ Subtask 57-26-15-942-050
 A. Removal of Equipment
 (1)
 Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the slat/flap control lever.

 (2)
 Remove the safety barriers

 (3)
 Remove the warning notice(s).

 (4)
 Remove the access platform(s).

 (5)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 


 BRACKET INSTALLATION - PYLON FAIRING - REMOVAL/INSTALLATION
___________________________________________________________
 TASK 57-26-16-000-001
 Removal of the Pylon Fairing Bracket
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific safety barriers
 No specific warning notice
 No specific access platform 3.0 m (9 ft. 10 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
54-54-00-000-001 Removal of the Aft Fixed Fairing
R 57-51-37-000-002 Removal of the Access Panels

R 573AB/573BB/573CB(673AB/673BB/673CB)
 57-26-16-991-001 Fig. 401


 3. Job Set-up__________
 Subtask 57-26-16-941-050
 A. Safety Precautions
 (1) Put a warning notice in the cockpit to tell persons not to start the engine 1 (2).
 (2) Put the safety barriers in position.
 Subtask 57-26-16-010-050
 