 On the panel 800VU:

 -put the applicable wing tank REFUEL VALVES switch to the SHUT position.

 (k)
 Stop the operation of the fuel tanker.

 (l)
 On the panel 800VU:


 -release the TEST switch from the HI LVL position
 -make sure that the applicable HI LVL light comes on
 -
put all of the REFUEL VALVES switches to the NORM and guarded position

 -
put the MODE SELECTOR switch to the OFF and guarded position.


 (5) If the access panel 550BB(650BB) has been removed, do the steps that follow:
 (a)
 Refuel the applicable wing tank fully and keep the fuel tanker connected to the aircraft (Ref. TASK 12-11-28-650-003).

 (b)
 Put a container on the access platform below the applicable water drain valve 21QM (22QM). Use the PURGING TOOL (97A28002117002) to open the water drain valve (Ref. TASK 28-25-00-650-003).

 (c)
 On panel 800VU:

 -
put the MODE SELECT switch to REFUEL

 -
put the applicable wing tank REFUEL VALVES switch to the OPEN position

 -
put the opposite wing tank REFUEL VALVES switch to the SHUT position

 -
put the TEST switch to the HI LVL position and hold it there


 -make sure that the applicable HI LVL light goes out.

 (d)
 Set the fuel tanker to its lowest flow-rate and pressure. Make sure that the fuel flows into the vent surge tank and out of the water drain valve 21QM (22QM) (Ref. TASK 28-25-00-650-003).

 (e)
 On panel 800VU:


 -put the applicable wing tank REFUEL VALVES switch to the SHUT position
 -make sure that the fuel-flow from the water drain valve decreases and stops.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 57-27-11Page 452 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 (f)
 Close the water drain valve (Ref. TASK 28-25-00-650-003) and remove the PURGING TOOL.

 (g)
 Put a container on the access platform below the applicable NACA vent in the surge tank.

 (h)
 On the panel 800VU:

 -put the applicable wing tank REFUEL VALVES switch to the OPEN position
 -make sure that the opposite wing tank REFUEL VALVES switch is in the SHUT position
 -hold the TEST switch in the HI LVL position.

 (i)
 Set the fuel tanker to its lowest flow rate and pressure. Let 100 l (26.4169 USgal) of fuel flow into the vent surge tank. Make sure that fuel flows out of the NACA vent.

 (j)
 On the panel 800VU:

 -put the applicable wing tank REFUEL VALVES switch to the SHUT position.

 (k)
 Stop the operation of the fuel tanker.

 (l)
 On the panel 800VU:


 -release the TEST switch from the HI LVL position
 -make sure that the applicable HI LVL light comes on
 -
put all of the REFUEL VALVES switches to the NORM and guarded position

 -
put the MODE SELECT switch to the OFF and guarded position.


 (6)
 For the access panel 550CB(650CB), refer to (Ref. TASK 28-12-45-400-002).

 (7)
 If the access panels 550CB(650CB) thru to 550DB(650DB) have been removed, do the steps that follow:

 (a)
 Refuel the applicable wing tank fully and keep the fuel tanker connected to the aircraft (Ref. TASK 12-11-28-650-003).

 (b)
 Put a container on the access platform below the applicable water drain valve 21QM (22QM). Use the PURGING TOOL (97A28002117002) to open the water drain valve (Ref. TASK 28-25-00-650-003).

 (c)
 On panel 800VU:

 -
put the MODE SELECT switch to REFUEL

 -
put the applicable wing tank REFUEL VALVES switch to the OPEN position

 

 


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 57-27-11Page 453 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 -
put the opposite wing tank REFUEL VALVES switch to the SHUT position

 -
put the TEST switch to the HI LVL position and hold it there


 -make sure that the applicable HI LVL light goes out.
 (d)
 Set the fuel tanker to its lowest flow-rate and pressure. Make sure that the fuel flows into the vent surge tank and out of the water drain valve 21QM (22QM) (Ref. TASK 28-25-00-650-003).

 (e)
 On panel 800VU:

 -put the applicable wing tank REFUEL VALVES switch to the SHUT position
 -make sure that the fuel-flow from the water drain valve
 decreases and stops.


 (f)
 Close the water drain valve (Ref. TASK 28-25-00-650-003) and remove the PURGING TOOL.
 