(a)
P7 Overhead Circuit Breaker Panel
1) 7F22 LANDING GEAR DSP & CONT PRI
2) 7F23 LANDING GEAR DSP & CONT ALTN
3) 7F25 PSEU SECT 1
4) 7F26 PSEU SECT 2
(b)
P6 Main Power Distribution Panel
1) 6F13 ENG 1 T/R CONT
2) 6F12 ENG 1 T/R IND
3) 6E13 ENG 2 T/R CONT
4) 6E12 ENG 2 T/R IND
5) 6D13 ENG 3 T/R CONT
6) 6D12 ENG 3 T/R IND
7) 6C13 ENG 4 T/R CONT
8) 6C12 ENG 4 T/R IND
F.
Remove the PSEU
(1)
Loosen the two clamps at the bottom of the PSEU.
(2)
Pull the PSEU out of the shelf.
S 034-003
S 024-004
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-09-03
ALL ú ú 02 Page 412 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
TASK 32-09-03-404-005
3. Installation of the PSEU
________________________
A. References
(1)
32-09-02/201, Air/Ground Relay System
(2)
32-09-03/501, PSEU - Adjustment/Test
(3)
IPC 32-61-01 Fig. 2
(4)
SSM 32-61-01
(5)
WDM 32-61-11
B.
Access
(1)
Location Zone 117 Left Electrical and Electronics Compartment
C.
Prepare to Install the PSEU.
S 864-006
(1)
Make sure circuit breakers are open as follows:
(a)
P6 Main Power Distribution Panel 1) 6F13 ENG 1 T/R CONT 2) 6F12 ENG 1 T/R IND 3) 6E13 ENG 2 T/R CONT 4) 6E12 ENG 2 T/R IND 5) 6D13 ENG 3 T/R CONT 6) 6D12 ENG 3 T/R IND 7) 6C13 ENG 4 T/R CONT 8) 6C12 ENG 4 T/R IND
(b)
P7 Overhead Circuit Breaker Panel 1) 7F22 LANDING GEAR DSP & CONT PRI 2) 7F23 LANDING GEAR DSP & CONT ALTN 3) 7F25 PSEU SECT 1 4) 7F26 PSEU SECT 2
D.
Install the PSEU
(1)
Put the PSEU on the E1-3 shelf
(2)
Tighten the two clamps at the bottom of the PSEU.
(3)
Do this task: Ground Test - PSEU (Ref 32-09-03/501).
S 434-007
S 434-008
S 744-009
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-09-03
ALL ú ú 02 Page 413 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
PROXIMITY SWITCH ELECTRONICS UNIT (PSEU) - ADJUSTMENT/TEST
__________________________________________________________
1. General_______
A. This procedure has two tasks:
(1)
The first task uses the CMCS to do a ground test for the PSEU.
(2)
The second task does an inductance and resistance test of the sensors and wiring to determine if the sensors operate correctly.
TASK 32-09-03-745-019
2. Ground Test - Proximity Switch Electronics Unit (PSEU)______________________________________________________
A. General
(1)
This test looks for sensor input failures to the PSEU. The ground test also does a check of the electronics in the PSEU.
(a)
The PSEU ground test does a check of the sensor and associated wiring (for open/short), regardless of the sensor near/far state. The PSEU will also do a target test for reasonable conditions.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 1(63)