(a)  
P7 Overhead Circuit Breaker Panel
 1) 7F22 LANDING GEAR DSP & CONT PRI
 2) 7F23 LANDING GEAR DSP & CONT ALTN
 3) 7F25 PSEU SECT 1
 4) 7F26 PSEU SECT 2
 (b)  
P6 Main Power Distribution Panel
 1) 6F13 ENG 1 T/R CONT
 2) 6F12 ENG 1 T/R IND
 3) 6E13 ENG 2 T/R CONT
 4) 6E12 ENG 2 T/R IND
 5) 6D13 ENG 3 T/R CONT
 6) 6D12 ENG 3 T/R IND
 7) 6C13 ENG 4 T/R CONT
 8) 6C12 ENG 4 T/R IND
 F. 
Remove the PSEU
 (1)  
Loosen the two clamps at the bottom of the PSEU.
 (2)  
Pull the PSEU out of the shelf.
 S 034-003
 S 024-004
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-09-03
 ALL  ú ú 02 Page 412 ú Jun 10/93 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 
MAINTENANCE MANUAL
 TASK 32-09-03-404-005
 3. Installation of the PSEU
________________________
 A. References
 (1)  
32-09-02/201, Air/Ground Relay System
 (2)  
32-09-03/501, PSEU - Adjustment/Test
 (3)  
IPC 32-61-01 Fig. 2
 (4)  
SSM 32-61-01
 (5)  
WDM 32-61-11
 B. 
Access
 (1)  
Location Zone 117 Left Electrical and Electronics Compartment
 C. 
Prepare to Install the PSEU.
 S 864-006
 (1)  
Make sure circuit breakers are open as follows:
 (a)  
P6 Main Power Distribution Panel 1) 6F13 ENG 1 T/R CONT 2) 6F12 ENG 1 T/R IND 3) 6E13 ENG 2 T/R CONT 4) 6E12 ENG 2 T/R IND 5) 6D13 ENG 3 T/R CONT 6) 6D12 ENG 3 T/R IND 7) 6C13 ENG 4 T/R CONT 8) 6C12 ENG 4 T/R IND
 (b)  
P7 Overhead Circuit Breaker Panel 1) 7F22 LANDING GEAR DSP & CONT PRI 2) 7F23 LANDING GEAR DSP & CONT ALTN 3) 7F25 PSEU SECT 1 4) 7F26 PSEU SECT 2
 D. 
Install the PSEU
 (1)  
Put the PSEU on the E1-3 shelf
 (2)  
Tighten the two clamps at the bottom of the PSEU.
 (3) 
Do this task: Ground Test - PSEU (Ref 32-09-03/501).
 S 434-007
 S 434-008
 S 744-009
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-09-03
 ALL  ú ú 02 Page 413 ú Jun 10/93 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 PROXIMITY SWITCH ELECTRONICS UNIT (PSEU) - ADJUSTMENT/TEST
__________________________________________________________
 1.  General_______
 A.  This procedure has two tasks:
 (1)  
The first task uses the CMCS to do a ground test for the PSEU.
 (2)  
The second task does an inductance and resistance test of the sensors and wiring to determine if the sensors operate correctly.
 TASK 32-09-03-745-019
 2.  Ground Test - Proximity Switch Electronics Unit (PSEU)______________________________________________________
 A.  General
 (1)  
This test looks for sensor input failures to the PSEU. The ground test also does a check of the electronics in the PSEU.
 (a)  
The PSEU ground test does a check of the sensor and associated wiring (for open/short), regardless of the sensor near/far state. The PSEU will also do a target test for reasonable conditions.
 
中国航空网 www.aero.cn