S 972-002
 (1)  Write the present leg faults, if it is necessary.
 NOTE: When you supply a new flight leg, you will erase the present
____
 leg faults from the last flight.
 S 862-003
 (2)  
Do this task to make sure the airplane is in the ground mode: "Check of the Air Mode/Ground Mode - Air/Ground Relay System" (Ref 32-09-02/201).
S 862-129
 (3)  
Make sure the left and center IRU's or the left and right IRU's are on.
 NOTE: The IRU's can be in the ALIGN, NAV or ATT mode.
____
 S 412-004
 (4)  
If one or more engines are in operation and have not stopped since the PSEU FAIL message was shown, do these steps:
 (a)  
Close all the entry doors.
 (b)  
Close all the cargo doors.
 (c)  
Close all the access doors.
 S 862-005
 (5)  
If no engines are in operation, do this task to start one engine as specified for usual operation: "Power Plant Operation (Normal)" (AMM 71-00-00/201).
S 862-079
 (6)  
Open these circuit breakers in the sequence that follows:
 (a)  
P7, Overhead Circuit Breaker Panel
 1) 7F25, PSEU SECT 1
 2) 7F26, PSEU SECT 2
 S 862-080
 (7)  
Close these circuit breakers in the sequence that follows:
 (a)  
P7, Overhead Circuit Breaker Panel
 1) 7F26, PSEU SECT 2
 2) 7F25, PSEU SECT 1
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-09-03
 ALL  ú ú 02 Page 202 ú Jun 18/01 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 S 862-010
 (8)  Stop for 30 seconds.
 S 742-011
 WARNING: YOU MUST DO THE OPERATIONAL TEST AFTER YOU SUPPLY A NEW FLIGHT
_______ LEG. IF YOU DO NOT DO THE TEST, IT IS POSSIBLE NOT TO FIND A FAILURE THAT IS THERE. THIS CONDITION CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (9) 
Do this task: "PSEU - Operational Test" (AMM 32-09-03/501).
S 742-012
 (10)
 Make sure that there is no PSEU FAIL message in the present leg faults.
S 862-077
 (11)
 If it is necessary, do this task to stop the engines :  "Power Plant Operation (Normal)" (AMM 71-00-00/201).
S 422-013
 (12)
 If the CDU shows the PSEU FAIL message after you do the operational test, replace the PSEU (AMM 32-09-03/401).
 TASK 32-09-03-862-055
 3.  Erase the PSEU Memory (CMC Ground BITE Test Procedure)______________________________________________________
 A. General
 (1)  
Before you do this procedure, make sure that the electrical power sources supply satisfactory power. Power sources that are unsatisfactory can cause a PSEU FAIL message that will not go away.
 B. 
References
 (1)  
AMM 24-22-00/201, Manual Control
 (2)  
AMM 32-09-03/501, Proximity Switch Electronics Unit
 C. 
Access
 (1)  
Location Zone
 221 Control Cabin, LH
 222 Control Cabin, RH
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-09-03
 ALL  ú ú 14 Page 203 ú Feb 18/02 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 
MAINTENANCE MANUAL
PSEU Connector Data 
Figure 201 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-09-03
 ALL  ú ú 05 Page 204 ú Jun 10/90 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 
MAINTENANCE MANUAL
DM7838FA SEE
UNIT SHELF REAR VIEW LOCATION E1-3 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 1(55)