(3)
AMM 12-31-41/201, Body Section 48 Access Doors and Panels
(4)
AMM 12-31-61/201, Wing Lower Surface Access Doors and Panels
(5)
AMM 12-31-91/201, Nacelle and Engine-to-Fairing Access Doors and Panels
(6)
AMM 24-22-00/201, Manual Control
(7)
AMM 36-05-00/201, Pneumatic System
(8)
AMM 36-12-25/401, Bleed Air Precooler
(9)
AMM 49-52-11/401, APU Bleed Air Valve
(10)
AMM 71-11-04/201, Fan Cowl Panels
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-12-25
ALL ú ú 01.1 Page 505 ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
C. Access
(1)
Location Zones
101 Control Cabin, Left side
102 Control Cabin, Right side
212 Left Air-Conditioning Equipment Bay
214 Right Air-Conditioning Equipment Bay
502/503 Fan Cowls - Left Nacelle
504/505 Thrust Reversers - Left Nacelle
602/603 Fan Cowls - Right Nacelle
604/605 Thrust Reversers - Right Nacelle
701 Tail Compartment
(2)
Access Panels
3303 Left side Air-Conditioning Access Panel
3403 Right Side Air-Conditioning Access Panel
4601L Aft Entry Door
5737/5837 Fan Cowl Assy
5738/5838 Thrust Reverser Cowl Assy
5739/5839 Thrust Reverser Cowl Assy
5746/5846 Fan Cowl Assy
D. Procedure
S 865-023
(1)
Supply electrical power (AMM 24-22-00/201).
S 865-004
(2)
Put these switches on the P5-10 panel to OFF position:
(a)
BLEED 1
(b)
BLEED 2
(c)
L PACK
(d)
R PACK
(e)
WING ANTI-ICE
(f)
TRIM AIR
(g)
ENG 1 START
(h)
ENG 2 START
S 025-010
(3) AIRPLANES WITH ASPIRATED TAT TUBE;
Do the steps that follow:
(a)
Disconnect the aspirated TAT tube at the pneumatic manifold duct.
(b)
Put a cap on the open boss at the pneumatic manifold duct.
(c)
Put a cap on the open end of the aspirated TAT tube to keep unwanted material out.
S 795-018
(4) To do a check for leakage on the right bleed air system, do these steps:
(a)
Put the APU BLEED switch to the ON position.
(b)
Make sure that the ISOLATION VALVE switch on the P5-10 panel is in the OPEN position (Fig. 501).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-12-25
ALL ú ú 01 Page 506 ú Mar 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
(c)
Pressurize the pneumatic system with the APU
(AMM 36-05-00/201).
(d)
When the bleed air duct pressure is stable, record the right duct pressure shown on the P5-10 panel.
(e)
Make sure that the right manifold is pressurized to a minimum of 20 psig.
(f)
At the same time on the P5-10 panel, put the ISOLATION VALVE switch to CLOSE and the APU BLEED switch to the OFF position.
(g)
Measure the time necessary for the right manifold duct pressure to decrease to 5 psi (INDICATOR END value) from one of the Duct Pressure Start values shown in the chart below.
~................................................... | DUCT PRESSURE| INDICATOR END | MINIMUM TIME PASS | | START (PSI) | (PSI) | (SEC) | ..................................................... | 50 | 5 | 7 | ..................................................... | 40 | 5 | 6 | ..................................................... | 30 | 5 | 5 | ..................................................... | 20 | 5 | 3 | 2..............…................…...................1
中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-300 400 500 AMM 飞机维护手册 PNEUMATIC(97)