S 864-016
(2)
Remove the DO-NOT-OPERATE tag and put the BLEED 2 switch, on the P5 panel, to the ON position.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-45
ALL ú ú 01 Page 404 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
APU CHECK VALVE - REMOVAL/INSTALLATION
______________________________________
1. General_______
A. This procedure contains two tasks. The first task removes the APU check valve. The second task installs the APU check valve.
B. The APU check valve is found in the air conditioning equipment bay. It is in the keel beam.
TASK 36-11-51-004-001
2. APU Check Valve Removal_______________________
A. References
(1) 36-05-00/201, Pneumatic System
B. Access
(1)
Location Zones
212 Air Conditioning Equipment Bay
215 Keel Beam
(2)
Access Panels
3303/3403 A/C Access Panel
C. Prepare to Remove the APU Check Valve
S 864-002
(1)
Make sure the engines are not in operation.
(2)
Make sure the APU is not in operation.
(3)
Remove the pressure from the pneumatic system (Ref 36-05-00/201).
(4)
Put DO-NOT-OPERATE tags on the BLEED switches.
(5)
Open the doors to get access to the air conditioning equipment bay.
S 864-003
S 864-004
S 864-005
S 014-006
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-51
ALL ú ú 02 Page 401 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500
MAINTENANCE MANUAL
SEE A
FWD
SEE B
A
APU CHECK
VALVE
APU MANIFOLD
DUCT
V-BAND CLAMP HINGE PIN
(2 LOCATIONS) BOSS
FWD
B
APU Check Valve Installation
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-51
ALL ú ú 01 Page 402 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
D. Remove the Valve (Fig. 401)
S 034-007
(1)
Remove the two V-band clamps from the manifold duct.
S 024-008
(2)
Remove the check valve from the APU manifold duct.
TASK 36-11-51-404-009
3. APU Check Valve Installation (Fig. 401)____________________________
A. References
(1) 36-05-00/210, Pneumatic System
B. Access
(1)
Location Zones
212 Air Conditioning Equipment Bay
215 Keel Beam
(2)
Access Panels
3303/3403 A/C Access Panel
C. Install the Valve
S 424-010
(1) Put the APU check valve in the correct position on the manifold duct.
NOTE: The flow arrow must be in the forward direction.
____
S 434-011
(2) Install the two V-band clamps on the manifold duct.
(a) Tighten the nuts of the V-band clamps to 45-55 pound-inches.
S 794-012
(3) Do this leakage test for the APU check valve.
(a) Use the APU to pressurize the pneumatic system (Ref 36-05-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 PNEUMATIC(76)