 (9)  Disconnect the lower support bracket assembly from the upper support bracket.
 (a) (b)  Remove the two nuts.Remove the two bolts that support the lower support bracket assembly to the upper support brackets.
 S 035-024

 (10)
 Remove the outboard bushing from the upper support bracket (View C, Fig. 502).

 S 435-025

 (11)
 Install the bushing on to the outboard side of upper support bracket.


 (a)  Make sure that the larger side of the bushing is positioned on the outboard side of the support bracket (View D, Fig. 502).
 S 425-024
 (12) Install the lower support bracket with the flange on the outboard side of the bushing (View D, Fig. 502).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-19-15
 ALL  ú ú 01 Page 504 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 435-029
 (13) Install a spacer of required thickness between the inboard edge of the bracket assembly and the support bracket to fill the gap created in the previous step (View A-A, Fig. 502).
 (a)  Install the bolts (one of the bolt has to be longer) and nuts.
 S 025-008
 (14)
 Install and secure the coupling to the duct and support bracket assembly at STA 1016.

 S 035-026

 (15)
 Remove the temporary shim.

 S 215-009

 (16)
 Make sure that there is sufficient clearance around the duct at these frame locations:

 (a)  
STA 1040 - minimum of 0.20 inch clearance

 (b)  
STA 1064 - minimum of 0.10 inch clearance

 


 S 435-010
 (17)
 If additional clearance is still necessary, clock the ducts as necessary.

 S 415-011

 (18)
 Tighten the couplings in sequence, move from one coupling to the next coupling in sequence.

 (a)  
Make sure that the coupling is properly seated, tap the coupling gently around the outer circumference of the coupling.

 (b)  
Tighten all the couplings at 20 inch-pounds initially, then increase the torque by not more than 10 inch-pounds intervals. 1) Torque the couplings to 50 inch-pounds.

 


 S 415-012
 (19) Position the duct and install the support clamps at STA 927 and STA 967.
 (a)  Torque the clamps to 50 inch-pounds.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-19-15
 ALL  ú ú 01 Page 505 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL

APU Supply Duct Adjustment
Figure 502 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-19-15
 ALL  ú ú 01 Page 506 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C46960
A 737-300/400/500MAINTENANCE MANUAL
PAN ASSEMBLY


(LOOKING AFT)
AIRPLANES WITHOUT BRACKET ADJUSTMENT A-A
AIRPLANES WITH BRACKET ADJUSTMENT APU Supply Duct Adjustment Figure 502 (Sheet 2)
C46836
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-19-15
 ALL  ú ú 01 Page 507 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
ROUNDED FLANGE LIP ON BRACKET (POINTS FORWARD)
ROUNDED FLANGE LIP ON BRACKET (POINTS FORWARD)

APU Supply Duct Adjustment
Figure 502 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 PNEUMATIC(113)