36-11-51
ALL ú ú 01 Page 403 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
(b)
Examine the valve for leakage at the V-band clamps. 1) Diffused leakage is permitted. 2) You must repair jet blast leakage.
(c)
Remove the pressure from the pneumatic system (Ref 36-05-00/201).
D. Put the Airplane Back to Its Usual Condition
S 414-013
(1) Close the door for the air conditioning equipment bay.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-51
ALL ú ú 01 Page 404 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
APU PRESSURE RELIEF VALVE - REMOVAL/INSTALLATION
________________________________________________
1. General
_______
A. This procedure contains two tasks. The first task removes the APU pressure relief valve. The second task installs the APU pressure relief valve.
TASK 36-11-61-004-001
2. APU Pressure Relief Valve Removal
_________________________________
A. References
(1) 36-05-00/201, Pneumatic System
B. Access
(1)
Location Zones
701 Tail Compartment
(2)
Access Panels
3701 Stabilizer Trim Access Door
C. Prepare to Remove the Valve
S 864-002
(1)
Make sure the APU is not in operation.
S 864-003
(2)
Make sure the engines are not in operation.
S 864-004
(3)
Remove the pressure from the pneumatic system (Ref 36-05-00/201).
S 864-005
(4)
Attach DO-NOT-CLOSE tags to the BLEED switches.
S 014-006
(5)
Open the stabilizer trim access door, 3701, to get access to the valve.
D. Remove the Valve (Fig. 401)
S 034-007
(1)
Remove the lockwire.
(2)
Loosen the valve.
S 024-009
(3)
Remove the valve from the mounting boss on the manifold duct for the APU.
S 034-008
NOTE: You will remove the packing ring with the valve.
____
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-61
ALL ú ú 02 Page 401 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
APU Pressure Relief Valve Installation
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-61
ALL ú ú 01 Page 402 ú Oct 25/84
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
TASK 36-11-61-404-010
3. APU Pressure Relief Valve Installation (Fig. 401)______________________________________
A. Consumable Materials
(1) D00006 - Antiseize Compound, NEVER SEEZ (AMM 20-30-21/201).
B. References
(1)
20-30-21/201, Lubricants
(2)
36-05-00/201, Pneumatic System
C. Access
(1)
Location Zones
701 Tail Compartment
(2)
Access Panels
3701 Stabilizer Trim Access Door
D. Install the Valve
S 964-011
(1)
Replace the packing ring on the pressure relief valve for the APU.
S 624-012
(2)
Apply a thin layer of the antiseize compound to the threads of the valve.
S 424-013
(3)
Install the valve in the mounting boss on the duct.
(a)
Tighten the valve.