1 NOT INSTALLED ON ALL AIRPLANES
Precooler Control Valve System Inspection/Check Figure 602 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-05
ALL ú ú 01 Page 606 ú Jul 15/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
(5) S 436-010Connect the -6 end of a TYPE A hose to the Precooler Control Valve supply pressure port.
(6) S 436-011Connect the -4 end of the TYPE A hose to Test Set Fitting No. 4. (See Fig. 602 Sheet 1)
(7) S 716-012Open the Test Set Shutoff Valve.
(8) S 716-013Turn the Primary Regulator knob clockwise until the Primary System Gauge indicates (50 | 5) psig.
(9) S 716-014Set the SYSTEM SELECTOR valve handle to the A position.
S 716-015
(10)
Turn Pressure Regulator No. 1 clockwise until Test Set Gauge No. 3 indicates (12.0 | 2.0) psig.
S 216-135
(11)
Use a mirror to examine the precooler control valve position indicator.
(a)
If the position indicator is within 30° of the full-CLOSED position, go to step G.(23).
(b)
If the position indicator is NOT within 30° of the full-CLOSED position, continue.
S 716-016
(12)
Set the SYSTEM SELECTOR valve handle to the OFF position.
S 026-017
(13)
Remove the TYPE A hose from the Precooler Control Valve supply port.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-05
ALL ú ú 01 Page 607 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 026-018
(14)
Remove the Precooler Sense Line from the right side of the Precooler Control Valve.
S 426-019
(15)
Install the MS21902-6 Union in the Precooler Sense Line fitting.
S 436-020
(16)
Connect the TYPE A hose to the Union.
S 716-021
(17)
Turn Pressure Regulator No. 1 clockwise until Test Set Gauge No. 3 indicates (10.0) psig.
S 216-136
(18)
Examine the 390°F thermostat, WTAI solenoid (If Installed), and associated fittings and lines for leakage.
(a)
If NO leakage is found, replace the precooler control valve (AMM 36-12-35/401), then go to step G.(40).
(b)
If leakage is found, replace and repair the damaged items as necessary, then continue.
S 716-022
(19)
Set the SYSTEM SELECTOR valve handle to the OFF position.
S 026-023
(20)
Remove the TYPE A hose from the Precooler Control Valve sense line.
S 026-024
(21)
Remove the Union from the Precooler Control Valve sense line.
S 436-025
(22)
Connect the TYPE A hose to the Precooler Control Valve supply pressure port.
S 716-026
(23)
Turn Pressure Regulator No. 1 counter-clockwise until (0.0) psig is indicated on Test Set Gauge No. 3.
(24)
Set the SYSTEM SELECTOR valve handle to the OFF position.
S 716-027
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-05
ALL ú ú 01 Page 608 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 026-028
(25) Remove these Test Set Caps:
(a) Cap No. 1
(b) Cap No. 5
(c) Cap No. 6
S 036-029
(26) Disconnect the TYPE A hose from Test Set Fitting No. 4.
S 436-030
(27) Install a Cap on Test Set Fitting No. 4.
S 436-031
(28) Connect the TYPE A hose to Test Set Fitting No. 1.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 PNEUMATIC(51)