EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-85
ALL ú ú 01 Page 503 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
HIGH-STAGE REGULATOR
SEE A HIGH-STAGE REGULATOR
CONTROL PRESSURE
SENSE LINE
SUPPLY PRESSURE SENSE LINE
TEST LINE
SUPPLY PRESSURE GAUGE (Ps)
FWD
NITROGEN SUPPLY PRESSURE
PRESSURE
REGULATOR A
High Stage Valve and High Stage Regulator Test Equipment
Figure 501 (Sheet 1)
B03154
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-85
ALL ú ú 01 Page 504 ú Nov 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
HIGH-STAGE REGULATOR HIGH-STAGE
SEE B
REGULATOR
CONTROL PRESSURE GAUGE (Pc)
CONTROL PRESSURE
SENSE LINE
SUPPLY PRESSURE SENSE LINE
TEST
LINE
SUPPLY PRESSURE
GAUGE (Ps)
FWD
NITROGEN SUPPLY PRESSURE
PRESSURE REGULATOR
B
High Stage Valve and High Stage Regulator Test Equipment Figure 501 (Sheet 2)
A55120
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-85
ALL ú ú 01 Page 505 ú Nov 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
HIGH-STAGE VALVE
SEE C
CONTROL PRESSURE
LINE TO HIGH-
STAGE VALVE
HIGH-STAGE
REGULATOR
HIGH-STAGE VALVE ACTUATOR
POSITION INDICATOR VALVE C HIGH-STAGE VALVE FWD
High Stage Valve and High Stage Regulator Test Equipment Figure 501 (Sheet 3)
A55133
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-85
ALL ú ú 01 Page 506 ú Nov 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 865-016
(10)
Use a wrench to put the high-stage valve to the open position.
S 865-017
(11)
While you hold the high-stage valve in the open position, put your thumb over the high-stage valve port (View C, Fig. 501) or you can install a cap over the high-stage valve port.
S 095-018
(12)
Remove the wrench and let the high-stage valve move to the closed position.
S 225-019
(13)
Monitor the amount of time it takes for the high-stage valve to go to the fully closed position.
S 725-020
(14)
Did it take less than 10 seconds for the high-stage valve to go to the fully closed position?
(a)
Yes, replace the high-stage valve (AMM 36-11-85/401).
(b)
No, continue.
S 035-042
(15)
Remove your thumb or the cap (if installed at an earlier step) from the high-stage valve port.
S 425-043
(16)
Reconnect the control pressure line to the high stage valve.
S 725-025
(17)
Slowly increase Ps to 110 +/- 10 psig.
S 725-026
(18)
Did control pressure go to less than 4 psig?
(a)
No, replace the high-stage regulator (AMM 36-11-86/401).
(b)
Yes, continue.
(19)
Decrease Ps to 0 psig.
S 085-028
(20)
Remove the nitrogen source, supply and control pressure gages, and test hoses.
S 865-027
G. Put the Airplane Back to its Usual Condition
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 PNEUMATIC(84)