(2)
The faulty system was fully operational prior to the fault
indication with all equipment properly installed.
(3)
All relevant circuit breakers were checked.
(4)
All applicable airplane/engine operating procedures were
accomplished.
(5)
The airplane is on the ground, it has been shut down in accordance with normal operating procedures and all power is off.
(6)
Fault was accurately described.
(7)
Generally, electrical wiring is satisfactory and power is available.
F. If the corrective action in the procedure does not correct the problem, check wiring using the wiring diagram. Prior to trouble shooting, check master Dim and Test circuits to ensure panel lights are operable.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-05
ALL ú ú 01 Page 155 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
G68844
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-05
ALL ú ú 01 Page 156 ú Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
(AMM 36-12-45/401). PRECOOLER CONTROL VALVE OPEN - Replace precooler control valve sensor BLEED TRIP OFF light illuminated. With engine off check precooler control valve visual indicator. Bleed air pressure was low during engine operation at 80% N1 or greater and the 401). precooler control valve (AMM 36-12-35/ PRECOOLER CONTROL VALVE CLOSED - Replace IF -
G68849
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-05
ALL ú ú 01 Page 157 ú Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
G68877
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-05
ALL ú ú 01 Page 158 ú Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
Bleed air pressure was between 0 and 10 psi during engine operation at idle.
visual indicator. IF -With engine off check high-stage valve
between 9th-stage ducting and high-stage regulator (PROCEDURE 2). IF -stage regulator and high-stage valve; line tubing for leakage between high-HIGH-STAGE VALVE CLOSED - Check sense
regulator (AMM 36-11-86/401). NO LEAKAGE - Replace high-stage
During engine operation with slow acceleration or deacceleration, bleed air pressure does not stabilize at 29 |3 psig.
HIGH-STAGE VALVE OPEN - Replace high-stage valve (AMM 36-11-85/401).
LEAKAGE - Replace or repair tubing.
G68879
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
36-11-05
ALL ú ú 01 Page 159 ú Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
PROCEDURE 1
Put BLEED switch to ON; disconnect electrical connector from bleed air regulator (AMM 36-11-16/401).
Manually wrench open PRSOV and hold open. Check applicable sense lines (between PRSOV and bleed air regulator and ducting and 450`F thermostat and precooler con-trol valve and sensor) while PRSOV is kept open. 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-300 400 500 AMM 飞机维护手册 PNEUMATIC(34)