• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 23:46来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

___________________________________________
 1.  General
_______
 A.  This procedure contains two tasks. The first task removes the ground air connector for the pneumatic system. The second task installs the ground air connector for the pneumatic system.
 B.  The ground air connector is found on the right side of the pneumatic manifold. It is adjacent to the front spar of the wing center section.
 TASK 36-11-45-004-001
 2.  Remove the Ground Air Connector (Fig. 401)
_______________________________
 A.  References
 (1)  36-05-00/201, Pneumatic System
 B.  Access
 (1)  
Location Zones 212 Air Conditining Equipment Bay - Right Side

 (2)  
Access Panel
 3404 A/C Access Door - Right Side

 

 C.  References
 (1)  36-05-00/201, Pneumatic System
 D.  Prepare to Remove the Ground Air Connector
 S 864-017
 (1)
Remove the pressure from the pneumatic system (Ref 36-05-00/201).

 S 864-002

 (2)  
Attach a DO-NOT-OPERATE tag and close the BLEED 2 switch on the P5 panel.

 S 014-003

 (3)  
Open the access panel for the ground air connector.

 S 034-004

 (4)  
Open the access panel for the right side of the air conditioning bay.


 E.  Remove the Ground Air Connector
 S 034-006
 (1)  Remove the attach nuts.
 NOTE: To prevent movement of or to prevent damage to the gasket
____ No. 1, keep the bolts in the position.
 S 024-009
 (2)  Remove the connector.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-11-45
 ALL  ú ú 02 Page 401 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500
MAINTENANCE MANUAL

SEE A
DUCT
BOLT
SEE B (TYPICAL)
FWD
GASKET NO. 1
A BRACKET
GASKET NO. 2
CONNECTOR NUT CONNECTOR
SEE C
C
PNEUMATIC GROUND
SERVICE CONNECTION
WARNING!

 SWITCH
BATTERY PWR. ON AND
SWITCH AIR COND. PACKS
OFF BEFORE SUPPLYING
AIR. LATCH

BACM10L1DGH
PNEUMATIC GROUND
SERVICE CONNECTOR
CAUTION ACCESS DOOR

MAX. AIR PRESS: 60 PSIG
SEE D
MAX. AIR TEMP : 450`F BACM10L1DUZ LATCH FWD B
D
Ground Air Connector Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-11-45
 ALL  ú ú 01 Page 402 ú Nov 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 034-008
 (3)
Remove the gasket No. 2.

 S 214-010

 (4)
Examine gasket No. 2.


 (a) Keep gasket No. 2 if it is not damaged.
 TASK 36-11-45-404-011
 3.  Install the Ground Service Connector (Fig. 401)____________________________________
 A. References
 (1) 36-05-00/201, Pneumatic System
 B. Access
 (1)  
Location Zones 212 Air Conditining Equipment Bay - Right Side

 (2)  
Access Panel 3404 A/C Access Door - Right Side


 C. References
 (1) 36-05-00/201, Pneumatic System
 D. Install the Ground Service Connector
 (1)  S 424-012Put the connector and gasket No. 2 in the correct position.
 (2)  S 434-013Install the nuts. (a) Tighten the nuts.
 (3)  S 794-014Do a check for leakage at the check valve for the connector. (a) Use the APU to pressurize the pneumatic system (Ref 36-05-00/201). (b) Examine the check valve for leakage.

 NOTE: Diffused leakage is permitted, jet blast leakage must be
____ repaired.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 36-11-45
 ALL  ú ú 01 Page 403 ú Jul 15/91
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 PNEUMATIC(75)