**ON A/C ALL
3. Job Set-up
__________
Subtask 36-13-41-860-051
A. Aircraft Maintenance Configuration
(1)
Make sure that the warning notices are in position:
-
in the cockpit on the Engine Control Panel 115VU to tell persons not to start the engine(s),
-
in the cockpit on the AIR COND Overhead Control Panel 30VU to tell persons not to push in the APU BLEED pushbutton switch,
(2)
Make sure that the access platform is in position below the access panel 191BB.
(3)
Make sure that the access panel 191BB is open.
Subtask 36-13-41-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR BLEED/X FEED/VALVE/BAT 2HV D13 49VU AIR BLEED/ENG 1/CTL 3HA1 D12 49VU AIR BLEED/ENG 1/MONG 2HA1 D11 122VU AIR BLEED/ENG 2/CTL 3HA2 Z23 122VU AIR BLEED/ENG 2/MONG 2HA2 Z22 122VU AIR BLEED/X FEED VALVE/NORM 1HV Z20
4. Procedure
_________
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,
(Ref. Fig. 401/TASK 36-13-41-991-001)
R **ON A/C 106-149, 211-299, 301-399, 401-499,
(Ref. Fig. 401A/TASK 36-13-41-991-001-A) **ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,
Subtask 36-13-41-420-050
A. Installation of the HP Ground Connector
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Remove the blanking cap from the duct.
(4)
Install the sealing ring (4) and the check valve (5) in the HP Ground Connector (3).
(5)
Install the sealing ring (6) and the HP Ground Connector (3) with eight washers (2) and nuts (1).
(6)
TORQUE the nuts (1) to between 0.7 and 0.8 m.daN (61.94 and 70.79 lbf.in)
R **ON A/C 106-149, 211-299, 301-399, 401-499,
Subtask 36-13-41-420-050-A
A. Installation of the HP Ground Connector
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Remove the blanking cap from the duct.
(4)
Install the sealing ring (4) and the check valve (5) in the HP Ground Connector (3).
(5)
Install the sealing ring (6) and the HP Ground Connector (3) with four washers (2) and the nut (1) at the long bolts and with one washer (2) and the nut (1) at the short bolts.
(6)
TORQUE the nuts (1) to between 0.7 and 0.8 m.daN (61.94 and 70.79 lbf.in)
R **ON A/C ALL
5. Close-up
________
Subtask 36-13-41-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the access panel 191BB.
(3)
Remove the access platform.
(4) Remove the warning notice(s).
Subtask 36-13-41-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1HV, 2HV, 2HA1, 2HA2, 3HA1, 3HA2 ENVIRONMENT PROTECTION - DESCRIPTION AND OPERATION
__________________________________________________
R 1. General
_______ R The environment protection system is divided into: R - the protection of the wing leading edge, R - the protection of the pylon, R - the protection of the nacelles.
A. Protection of the Wing Leading Edge, the Pylon and the Nacelles The protection systems of the wing leading edge, the pylon and the nacelles keep the pressure in these areas to a limit. The protection systems operate if a pneumatic duct or a wing anti-ice duct bursts or has a large leak. This prevents damage to the structure and the systems installed.
R 2. Component Location
__________________
R A. Ventilation of the Wing Leading Edge
R -------------------------------------------------------------------------------R FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA R I I I I DOOR I REF. R -------------------------------------------------------------------------------
R INLET - NACA RAM AIR, LH R INLET - NACA RAM AIR, RH R DUCT - PICCOLO, NO. 1, LH R DUCT - PICCOLO, NO. 1, RH R DUCT - PICCOLO, NO. 2, LH R DUCT - PICCOLO, NO. 2, RH R DUCT - PICCOLO, NO. 3, LH R DUCT - PICCOLO, NO. 3, RH R DUCT - PICCOLO, NO. 4, LH R DUCT - PICCOLO, NO. 4, RH R DUCT - PICCOLO, NO. 5, LH R DUCT - PICCOLO, NO. 5, RH R DUCT - PICCOLO, NO. 6, LH R DUCT - PICCOLO, NO. 6, RH R DUCT - PICCOLO, NO. 7, LH R DUCT - PICCOLO, NO. 7, RH 521 521BB 36-14-11 621 621BB 36-14-11 521 521AB 36-14-11 621 621AB 36-14-11 521 521CB 36-14-11 621 621CB 36-14-11 521 521EB 36-14-11 621 621EB 36-14-11 521 521EB 36-14-11 621 621EB 36-14-11 521 521GB 36-14-11 621 621GB 36-14-11 521 521AT 36-14-11 621 621AT 36-14-11 521 521AT 36-14-11 621 621AT 36-14-11
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PNEUMATIC 气源 2(99)