• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:15来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  **ON A/C 401-499, 
R  Subtask 36-11-51-480-050-A 
R  A. Installation of the Tool 
R  (1) Remove the blanking plug from the test port of the HP bleed valve. 
R R  (2) Connect the BLEED EXTERNAL CLAPPER (M82000460) to the test port of the HP bleed valve. 
R R R  (3) Connect the TEST SET - ENGINE BLEED SYSTEM (98D36003000000) or TEST SET - ENGINE BLEED SYSTEM (98F36003002000) to the BLEED EXTERNAL CLAPPER (M82000460).

 

 Functional Test of the High Pressure (HP) Bleed Valve Figure 501A/TASK 36-11-51-991-001-A
R 1EFF : 004-049, 055-099, 101-149, 151-199, 1 36-11-51Page 507 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 **ON A/C 001-003, 051-054,

 Subtask 36-11-51-720-050
 B. Functional Test of the HP Bleed Valve
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the test set:  On the test set:
 - open the shutoff valve of the  - the pressure gage of the air cylinder
 air cylinder.  shows the pressure.
 2. On the test set:  On the test set:
 - use the primary regulator to  - the primary gage shows 200 PSIG.
 pressurize the pressure source
 to 200 psi (13.7895 bar)
 3. On the test set:  On the HP bleed valve:
 - slowly pressurize the system  - the visual position indicator shows
 No. 1 to 30 psi (2.0684 bar)  that the valve is open.
 4. In the cockpit, on the AIR COND  On the HP bleed valve:
 panel 30VU:  - the visual position indicator shows
 - release the related ENG BLEED  that the valve is closed.
 pushbutton switch (the OFF
 legend comes on).
 5. In the cockpit, on the AIR COND  On the HP bleed valve:
 panel 30VU:  - the visual position indicator shows
 - push the related ENG BLEED  that the valve is open.
 pushbutton switch (the OFF
 legend goes off).
 6. On the test set:  On the HP bleed valve:
 - decrease the pressure of the  - the visual position indicator shows
 system No. 1 to 0.  that the valve is closed. 

R 1EFF : 001-003, 051-054, 1 36-11-51Page 508 1 1 Aug 01/05 1 1 1CES 1

 

R **ON A/C 004-049, 055-099, 101-149, 151-199, 201-299, 301-399, 401-499,

 Subtask 36-11-51-720-050-A
 B. Functional Test of the HP Bleed Valve
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the test set:  On the test set:
 - open the shutoff valve of the  - the pressure gage of the air cylinder
 air cylinder.  shows the pressure.
 2. On the test set:  On the test set:
 - use the primary regulator to  - the primary gage shows 200 psi
 pressurize the pressure source  (13.7895 bar)
 to 200 psi (13.7895 bar)
 3. On the test set:  On the HP bleed valve:
 - slowly pressurize the system  - the visual position indicator shows
 No. 1 to 15 psi (1.0342 bar)  that the valve is open.
 4. In the cockpit, on the AIR COND  On the HP bleed valve:
 panel 30VU:  - the visual position indicator shows
 - release the related ENG BLEED  that the valve is closed.
 pushbutton switch (the OFF
 legend comes on).
 5. In the cockpit, on the AIR COND  On the HP bleed valve:
 panel 30VU:  - the visual position indicator shows
 - push the related ENG BLEED  that the valve is open.
 pushbutton switch (the OFF
 legend goes off).
 6. On the test set:  On the HP bleed valve:
 - decrease the pressure of the  - the visual position indicator shows
 system No. 1 to 0.  that the valve is closed. 

R 1EFF : 004-049, 055-099, 101-149, 151-199, 1 36-11-51Page 509 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1


R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 Subtask 36-11-51-080-050
 C. Removal of the Tool
R  (1) Disconnect the test set from the test port of the HP bleed valve. (2) Install the blanking plug on the test port of the HP bleed valve. (3) On the AIR COND panel 30VU, release all the ENG BLEED pushbutton switches (the OFF legends come on). **ON A/C 401-499, 
R  Subtask 36-11-51-080-050-A 
R  C. Removal of the Tool 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PNEUMATIC 气源 2(17)