 -make sure that the X-bleed selector switch is in the AUTO position.

 (2)
 Do the EIS stop procedure
 (Ref. TASK 31-60-00-860-002).


 (3)
 De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 

 Subtask 36-12-00-410-051
 B. Close Access
 (1)
 Disconnect the ground air-supply unit to the aircraft HP connector 7300HM.

 (2)
 Close the access door 191BB.


 1EFF : ALL 1 36-12-00Page 207 1 1 Aug 01/02R 1 1 1CES 1


 (3)
 If the access door 811 is open:

 -Remove the warning notice(s).
 -Close the access door 811 (Ref. TASK 52-41-00-410-002).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 


 APU BLEED AIR SUPPLY AND CROSSBLEED SYSTEMS - ADJUSTMENT/TEST
_____________________________________________________________
 TASK 36-12-00-710-001
 Operational Test of the APU Bleed Air Supply and Crossbleed Systems
 1. Reason for the Job
__________________
 To check the correct operation of the crossbleed valve indicating circuit.
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power
 31-60-00-860-001 EIS Start Procedure
 31-60-00-860-002 EIS Stop Procedure


R  49-00-00-860-003 APU Start by External Power (GTCP 36-300)
R  49-00-00-860-004 APU Shutdown by External Power (GTCP 36-300) 49-00-00-860-005 APU Start by External Power (APS 3200) 49-00-00-860-006 APU Shutdown by External Power (APS 3200) 49-00-00-860-008 APU Start by External Power (131-9(A)) 49-00-00-860-009 APU Shutdown by External Power (131-9(A))

 3. Job Set-up
__________

 Subtask 36-12-00-865-050
 A. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR BLEED/X FEED/VALVE/BAT 2HV D13 49VU AIR BLEED/ENG 1/CTL 3HA1 D12 49VU AIR BLEED/ENG 1/MONG 2HA1 D11 121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41 122VU AIR BLEED/ENG 2/CTL 3HA2 Z23 122VU AIR BLEED/ENG 2/MONG 2HA2 Z22 122VU AIR BLEED/X FEED VALVE/NORM 1HV Z20

R **ON A/C 001-049, 101-105, 151-199, 201-210,
 Subtask 36-12-00-860-051-A
 B. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)
 Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).

 (3)
 On AIR COND panel 30VU, make sure that the OFF legends on the PACK 1 and PACK 2 pushbutton switches are on.

 (4)
 Start the APU (Ref. TASK 49-00-00-860-008).

 

 **ON A/C 051-099,


 Subtask 36-12-00-860-051
 B. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)
 Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).

 (3)
 On AIR COND panel 30VU, make sure that the OFF legends on the PACK 1 and PACK 2 pushbutton switches are on.


 (4) Start the APU (Ref. TASK 49-00-00-860-003). R **ON A/C 106-149, 211-299, 301-399, 401-499,
 Subtask 36-12-00-860-051-B
 B. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)
 Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).

 (3)
 On AIR COND panel 30VU, make sure that the OFF legends on the PACK 1 and PACK 2 pushbutton switches are on.

 (4)
 Start the APU (Ref. TASK 49-00-00-860-005).


R 1EFF : 051-099, 106-149, 211-299, 301-399, 1 36-12-00Page 503 1401-499, 1Aug 01/05 1 1 1CES 1

 **ON A/C ALL


 4. Procedure
_________ Subtask 36-12-00-710-050
 A. Operational Test of the APU Bleed Air Supply and Crossbleed System
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
 