_______ WORK ON THE PNEUMATIC SYSTEM.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific warning notices
 No specific access platform 2.2 m (7 ft. 3 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
36-11-56-991-001 Fig. 401

 3. Job Set-up
__________

 Subtask 36-11-56-865-050
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR BLEED/X FEED/VALVE/BAT 2HV D13 49VU AIR BLEED/ENG 1/CTL 3HA1 D12 49VU AIR BLEED/ENG 1/MONG 2HA1 D11
 122VU AIR BLEED/ENG 2/CTL 3HA2 Z23 122VU AIR BLEED/ENG 2/MONG 2HA2 Z22 R 122VU AIR BLEED/X FEED VALVE/NORM 1HV Z20
 Subtask 36-11-56-860-050
 B. Aircraft Maintenance Configuration
 (1) Put the warning notices in position:
 -
in the cockpit on the Engine Control Panel 115VU to tell persons not to start the engine(s),

 -
in the cockpit on the AIR COND Overhead Control Panel 30VU to tell persons not to push in the APU BLEED pushbutton switch,


 - on the HP ground connector to tell persons not to pressurize the pneumatic system.
 (2) Put the access platform in position below zone 190.
 Subtask 36-11-56-010-050
 C. Remove the access panel 191BB or 192FB.
 4. Procedure
_________
 (Ref. Fig. 401/TASK 36-11-56-991-001)
 Subtask 36-11-56-020-050
 A. Removal of the Pressure Service Check-Valve
 (1)
 Remove and discard the lockwire from the union (1) and the pressure service check-valve (2).

 (2)
 Remove and discard the lockwire from the pressure service check-valve

 (2) and the connector (4).

 (3)
 Loosen the union (1) from the pressure service check-valve (2).


 (4)
 Remove the pressure service check-valve (2) and the O-ring (3) from the connector (4).

 (5)
 Discard the O-ring (3).

 (6)
 Put the blanking caps on the union (1) and the connector (4).

 


 Pressure Service Check-Valve 7270HM, 7272HM
 Figure 401/TASK 36-11-56-991-001
 1EFF :  ALL  1  36-11-56 Page 403 
1  1  Feb 01/98
 1  1
 1CES  1

 


 TASK 36-11-56-400-001


 Installation of the Pressure Service Check-Valve (7270HM, 7272HM)
 WARNING : MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START_______ WORK ON THE PNEUMATIC SYSTEM.
 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific No specific No specific  warning noticesaccess platform 2.2 m (7 ft. 3 in.)Torque Wrench : range 1.00 to 10.00 m.daN (8.00 to 75.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R  Material No. 06-008 Material No. 06-014 Material No. 19-010  AI TNA 007-10006 LUBRICANT (Ref. 20-31-00) DRY FILM LUBRICANT (Ref. 20-31-00)USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
3  O-ring  36-11-03 06A-150

 

 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 