• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:15来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Install the access panels as necessary:

 (a)
 For the APU overheat sensing elements between the FR49 and FR52:

 -Install the access panel 151DW.

 (b)
 For the APU overheat sensing elements between the FR52 and FR55:

 -Install the access panel 151EW.

 (c)
 For the APU overheat sensing elements between the FR55 and FR58:

 -Install the access panel 151HW.

 (d)
 For the APU overheat sensing elements between FR58 and FR59:

 -Install the access panel 151JW.

 (e)
 For the APU overheat sensing elements between the FR59 and FR62:

 -Install the access panel 161AW.

 (f)
 For the APU overheat sensing elements between the FR62 and FR63:

 -Install the access panel 161BW.

 (g)
 For the APU overheat sensing elements between the FR63 and FR65:


 -Install the access panel 161CW.

 (3)
 For the APU overheat sensing elements between the FR65 and FR70:

 -Install the partition panel 161DW (Ref. TASK 25-55-12-400-001).

 (4)
 Close the AFT cargo compartment door (Ref. TASK 52-30-00-860-002).

 (5)
 For the APU overheat sensing elements between the FR70 and FR77:

 -Close the access door 312AR.

 (6)
 For the APU overheat sensing elements aft of FR77:

 


 -Close the access door 314AR. R **ON A/C 151-199, 401-499,
 Subtask 36-22-17-410-052-B
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panels as necessary:

 (3)
 For the APU overheat sensing elements between the FR53 and FR56:

 -Install the access panel 151TW.

 (4)
 For the APU overheat sensing elements between the FR56 and FR58:

 -Install the access panel 151UW.

 (5)
 For the APU overheat sensing elements between the FR58 and FR59:

 -Install the access panel 151VW.

 (6)
 For the APU overheat sensing elements between the FR59 and FR62:

 -Install the access panel 161AW.

 (7)
 For the APU overheat sensing elements between FR62 and FR63:

 -Install the access panel 161BW.

 (8)
 For the APU overheat sensing elements between the FR63 and FR65:

 -Install the access panel 161CW.

 (9)
 For the APU overheat sensing elements between the FR65 and FR70:

 


 -Install the partition panel 161DW (Ref. TASK 25-55-12-400-001).
 (10)
 Close the AFT cargo compartment door (Ref. TASK 52-30-00-860-002).

 (11)
 For the APU overheat sensing elements between the FR70 and FR77:

 -Close the access door 312AR.

 (12)
 For the APU overheat sensing elements aft of FR77:


 -Close the access door 314AR. **ON A/C ALL
 Subtask 36-22-17-865-054
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1HV, 2HV, 2HA1, 2HA2, 3HA1, 3HA2.
 Subtask 36-22-17-942-054
 C. Put the aircraft back to its initial configuration.
 (1)
 Remove the access platform(s).

 (2)
 Remove the warning notice(s).


 1EFF : ALL 1 36-22-17Page 612 1 1 Nov 01/02R 1 1 1CES 1


 SENSING ELEMENT - OVERHEAT, FUSELAGE (LOOP A AND B) (30HF,31HF,32HF,33HF,34HF,
______________________________________________________________________________ 35HF,36HF,47HF,57HF,58HF,59HF,60HF,61HF,62HF,63HF...) - REMOVAL/INSTALLATION
____________________________________________________________________________ TASK 36-22-18-000-001 Removal of the Fuselage Overheat Sensing-Elements (Loop A and B)
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific adjustable access platform up to 2.5 m (8 ft. 2 in.) No specific blanking cap No specific blanking caps No specific circuit breaker(s) safety clip(s) No specific warning notice
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
36-22-18-991-001 Fig. 401 3. Job Set-up
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PNEUMATIC 气源 2(148)