5. Close-up
________ Subtask 36-11-49-410-104
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the thrust reverser doors (Ref. TASK 78-36-00-410-040): FOR 1000EM1 451AL, 452AR FOR 1000EM2 461AL, 462AR
Subtask 36-11-49-440-073
B. Make the thrust reverser serviceable (Ref. TASK 78-30-00-081-041). Subtask 36-11-49-410-105
C. Close Access
(1)
Close the fan cowl doors (Ref. TASK 71-13-00-410-040):
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR
(2)
Remove the access platform(s).
(3) Remove the warning notice(s). Subtask 36-11-49-865-130
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 3HA1, 3HA2, 2HA1, 2HA2.
TASK 36-11-49-200-004
Detailed Visual Inspection of the Upper High Pressure Duct
WARNING : MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START
_______ WORK ON THE PNEUMATIC SYSTEM.
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______ THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO ONE HOUR.
1. Reason for the Job
__________________
Refer to the MPD TASK: 361100-08
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific warning notice
No specific access platform 0.5 m (1 ft. 8 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors 78-30-00-081-041 Make the Thrust Reverser Serviceable after
Maintenance 78-30-00-481-041 Make the Thrust Reverser Unserviceable for
Maintenance 78-36-00-010-040 Opening of the Thrust Reverser Doors 78-36-00-410-040 Closing of the Thrust Reverser Doors
3. Job Set-up
__________
Subtask 36-11-49-861-089
A. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
Subtask 36-11-49-941-109
B. Safety Precautions
(1)
Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2)
On the AIR COND panel 30VU:
-
Make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on).
-
Make sure that the APU BLEED pushbutton switch is released (the ON legend is off).
-Put a warning notice in position to tell persons not to operate the pneumatic system.
(3)
On the ENG panel 115VU:
-Put a warning notice in position to tell persons not to start the engine 1(2).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PNEUMATIC 气源 2(10)