• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-11 09:19来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 494-022
 WARNING: YOU MUST CAREFULLY INSTALL THE GROUND LOCKS IN ALL LANDING
_______ GEAR. AN ACCIDENTAL RETRACTION OF THE LANDING GEAR CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (2) Install the ground locks in all landing gear (AMM 09-11-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-18-04
 ALL  ú ú 01 Page 401 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL


FILL INDICATOR FOR THE RESERVOIR QUANTITY

A

Reservoir Quantity Fill Indicator Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-18-04
 ALL  ú ú 01 Page 402 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 864-023
 (3)  
Open this circuit breaker and attach a DO-NOT-CLOSE tag:

 (a)  
P7 Overhead Circuit Breaker Panel
 1) 7G4 HYDRAULICS FLUID QTY

 

 S 034-005
 (4)  
Disconnect the electrical connector from the fill indicator for the reservoir quantity.

 S 034-024

 (5)  
Remove the four screws from the fill indicator.

 S 024-025

 (6)  
Remove the fill indicator from the bracket.


 TASK 29-18-04-404-007
 3.  Reservoir Quantity Fill Indicator Installation (Fig. 401)______________________________________________
 A. References
 (1)  
AMM 12-12-01/301, Hydraulic Systems

 (2)  
AMM 20-22-01/601, Electrical Bonds and Grounds

 (3)  
AMM 24-22-00/201, Manual Control

 (4)  
AMM 32-00-30/201, Landing Gear Door Locks

 (5)  
IPC 29-18-04 Fig. 1

 B.
Access

 (1)  
Location Zone
 137A Body Landing Gear Wheel Well, LH


 C.
Procedure


 S 144-008
 (1)  
Clean the mating surfaces on the fill indicator for reservoir quantity and the bracket (AMM 20-22-01/601).

 (2)  
Put the fill indicator in the bracket.


 S 424-009
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-18-04
 ALL  ú ú 01 Page 403 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (3)  S 434-026Install the screws to attach the fill indicator to the bracket.
 (4)  S 764-027Measure the resistance between the fill indicator and the bracket.
 NOTE:  This resistance must be less than 0.0025 ohms.

 S 434-011
 (5)  
Connect the electrical connector to the fill indicator.

 S 864-012

 (6)  
Remove the DO-NOT-CLOSE tag and close this circuit breaker:

 (a)  
P7 Overhead Circuit Breaker Panel 1) 7G4 HYDRAULICS FLUID QTY


 S 864-028
 (7)  
Supply electrical power (AMM 24-22-00/201).

 S 864-013

 (8)  
Push the HYD switch on the EICAS Display Select Panel.

 S 614-014

 (9)  
Fill or drain the reservoirs until the HYD QTY shown on the EICAS Hydraulic Synoptic Display for each system is approximately 1.00 (AMM 12-12-01/301).

 S 714-029

 (10)
 Do a check of the fill indicator:

 (a)  
Monitor the fill indicator while you put the selector valve to the position for each hydraulic system.

 (b)  
For hydraulic systems No. 2 and No. 3, make sure the indication on the wheel well gage reads "F" (full) and matches the EICAS hydraulic quantity display. Full is equal to 5.5 U.S. Gallons


 (4.6 Imperial Gallons).
 (c)  For hydraulic systems No. 1 and No. 4, make sure the indication on the wheel well gage reads "F" (full) and matches the EICAS hydraulic quantity display. Full is equal to 9.5 U.S. Gallons
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 液压 HYDRAULIC 2(90)