 (2)  Remove the HYQUIM (AMM 20-11-22/401).
 TASK 29-33-02-404-004
 3.  Hydraulic Quantity Interface Module (HYQUIM) Installation (Fig. 401)_________________________________________________________
 A.  References
 (1)  
AMM 20-11-22/401, E/E Rack Mounted Components

 (2)  
AMM 24-22-00/201, Manual Control

 (3)  
AMM 29-33-02/501, Hydraulic Quantity Interface Module (HYQUIM)

 B.  
Access

 (1)  
Location Zone
 118 Main Equipment Center

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-33-02
 ALL  ú ú 03 Page 401 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

FWD
SEE A
HYQUIM ELECTRONIC MODULE
E2 EQUIPMENT RACK
A

Hydraulic Quantity Indicating Module (HYQUIM) Installation

Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-33-02
 ALL  ú ú 01 Page 402 ú Oct 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 C. Procedure
 S 424-005
 (1)  
Install the HYQUIM (AMM 20-11-22/401).

 S 864-025

 (2)
Remove the DO-NOT-CLOSE tags and close these circuit breakers:

 (a)  
P7 Overhead Circuit Breaker Panel
 1) 7G04 HYDRAULICS FLUID QTY


 (b)  
P414 main power distribution panel.
 1) E25 HYD FLUID QTY IND

 

 S 864-006
 (3)  Do the ground test for the HYQUIM (AMM 29-33-02/501).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-33-02
 ALL  ú ú 03 Page 403 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 HYDRAULIC QUANTITY INTERFACE MODULE (HYQUIM) - ADJUSTMENT/TEST
______________________________________________________________
 1.  General_______
 A.  This procedure has one task. This task does a ground test of the hydraulic quantity interface module (referred to as the HYQUIM). No adjustment of the HYQUIM is possible.
 B.  The HYQUIM is installed in the main equipment center. The HYQUIM is an electronic module installed in the E2 electronics rack.
 C.  The ground test for the Hydraulic Quantity Interface Module (HYQUIM) commands these conditions to occur:
 (1)  
The Hydraulic Quantity Interface Module (HYQUIM) to do a self test.

 (2)  
The test of each of the four hydraulic system quantity transmitters and the wiring interfaces to HYQUIM.

 (3)  
The test of the remote quantity indicator interface to HYQUIM.

 (4)  
Momentary blanking of the hydraulic quantity indications from the EICAS displays.

 (5)  
Momentary illumination of the four hydraulic system SYS FAULT flight deck indication lamps (P5 Panel).

 D.  
If the HYQUIM self test fails, one of the transmitter tests fails, or the remote quantity indicator test fails, then the ground test fails.


 TASK 29-33-02-745-001
 2.  Hydraulic Quantity Interface Module (HYQUIM) Ground Test________________________________________________________
 A.  General
 (1)  
This is a test of the BITE functions of the HYQUIM.

 B.  
References

 (1)  
AMM 24-22-00/201, Manual Control

 C.  
Access

 (1)  
Location Zones
 221 Control Cabin, LH
 222 Control Cabin, RH


 D.  
Prepare for the Test.

 (1)  
Supply electrical power (AMM 24-22-00/201).

 S 865-004

 (2)  
Prepare the CDU for the test:

 (a)  
 