R Repair of Metallic Conduits - Repair Procedure for Screened Convoluted Conduits R Repair Type 2-B R Figure 005
20-53-32 Page 8
R Repair of Metallic Conduits - Repair Procedure for Overbraided Conduits Repair Type 2-B
R Figure 006
20-53-32 Page 9
R Repair of Metallic Conduits - Repair Procedure of the Overbraid R Repair Type 2-D R Figure 007
20-53-32 Page 10
R Repair of Metallic Conduits - Repair Procedure of the Overbraid R Repair Type 2-D R Figure 008
20-53-32 Page 1120-53-32 Page 12
R - Step 3: Install the split conduit EN6049-008 over the damaged area.
R - Step 4: Crimp the split conduit with metallic clamping strip
R E0805-2 at the center level of the half shells.
R - Step 5: Wrap the damaged area with two layers of ABS5334
R self-welding tape (overlap 50% and 30 mm (1.1811 in.) each side
R over the external protection.
R (5) Repair type 2-E - Wrapping with two levels of self-welding tape
R ABS5334 and split conduit EN6049-008
R (Ref. Fig. 009, 010)
R - Step 1: Clean the area using ASN42202 cleaning product and a little
R brush.
R Cut the external protection (if installed), the overbraid and the
R internal protection in the damaged area.
R - Step 2: Install two half shells ABS0940 and fold back the overbraid
R on the shells extending 30 mm (1.1811 in.) each side of the damaged
R area.
R - Step 3: Wrap with 2 layers of self-welding tape ABS5334 (overlap
R 50% and 30 mm (1.1811 in.) each side of the damaged area).
R - Step 4: Install the split conduit EN6049-008 extending 30 mm
R (1.1811 in.) each side of the ABS5334 wrapping.
R - Step 5: Crimp the split conduit with metallic clamping strip
R E0805-2 at the center level of the half shells.
R - Step 6: Wrap the damaged area with 2 layers of self-welding tape
R ABS5334 (overlap 50% and 30 mm (1.1811 in.) each side over the
R external protection).
R (6) Repair type 2-F - Replacement of the pull-back braid by ABS1353-005
R and self-welding tape ABS5334
R (Ref. Fig. 011, 012)
R - Step 1: Clean the area using ASN42202 cleaning product and a little
R brush.
R Cut the external protection (if installed) to 210 mm (8.2677 in.).
R Cut the overbraid 180 mm (7.0866 in.) from the backshell.
R - Step 2: Fold back the overbraid on the shells, 200 mm (7.8740 in.)
R from the backshell.
R - Step 3: Install the braid ABS1353-005 to replace the removed
R pull-back braid.
R - Step 4: Crimp the braid ABS1353-005 on the half shells ABS0940 with
R a metallic clamping strip E0805-2.
R Protect the cutting edges of the metallic clamping strip adding 5
R layers of self-welding tape ABS5334.
R Crimp the metallic clamping strip E0805-2.
R - Step 5: Wrap the repair area with self-welding tape ABS5334.
R Protect the cutting edges of the metallic clamping strip doing 5
R turns of the tape over the same position at the rear of the
R backshell.
R Repair of Metallic Conduits - Repair Procedure of the Overbraid R Repair Type 2-E R Figure 009
20-53-32 Page 13
R Repair of Metallic Conduits - Repair Procedure of the Overbraid R Repair Type 2-E R Figure 010
20-53-32 Page 14
R Repair of Metallic Conduits - Repair Procedure - Modification Kit Installation R Repair Type 2-F and 2-G R Figure 011
20-53-32 Page 15
R Repair of Metallic Conduits - Repair Procedure of the Overbraid R Repair Type 2-F R Figure 012
20-53-32 Page 1620-53-32 Page 17
R (7) Repair type 2-G - Modification kit addition by replacement of the 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 ESPM Electrical Standard Practices Manual 4(84)