• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 22:14来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  released.
R  ____NOTE : If you cannot apply the torque in one continuous operation (limited 
R  travel or access), do the last torquing operation with a sufficiently 
R  large movement (with a rotation of 30 degrees minimum). 
R  - Turn the torquing tool slowly to avoid excessive torquing after the 
R  torquing tool is released. Particular care must be taken when automatic or 
R  semi-automatic torquing tools are used. 
R  Remove the torquing tool immediately when the torque value is applied. 

R  - In specific cases only, check that the connecting items are correctly 
R  locked by re-torquing to the correct value. 
R  - In general cases, ckeck that the connecting items are correctly locked by 
R  lightly pulling them. 
R  - Make sure that there is at least one and half threads of the threaded pin 
R  visible above the nut. 
R  - Make sure that the terminals are parallel and the position of the 
R  assembled components has not changed. 

R  - Except at circuit breakers, all electrical connections attached with 
R  screws and electrical cables with a cross-section equal to or greater than 
R  5 mm2 (cable sizes 10, 8, 6 etc...) must be identified with red varnish. 

R  (Ref. Fig. 002) 
R
R  ______________5. Specific cases 
R  - On terminal block: 
R  Remove the nut and leave the threaded stud free. 
R  - Other hardware: 
R  Tighten the connection nuts to the recommended torque values.

 

20-51-50 Page 3

R Torquing Procedure - Typical Procedure Figure 001


20-51-50 Page 4

R Torquing Procedure - Mark After Torquing Figure 002


20-51-50 Page 520-52-00 Page 120-52-10 Page 1

 ______________________________________________________INSPECTION/CHECK AND TESTS - DESCRIPTION AND OPERATION
R  _______1. General This chapter gives general rules for electrical inspection/check and test.
 _______________________2. Sructure of the Chapter
 A. Electrical Inspection/Checks (Ref. 20-52-10)
 B. Electrical Test (Ref. 20-52-20)
R R R R R R R R R  ______3. Rules. Each time a wire or other electrical item is added, repaired, disconnected/reconnected, before you do the close-up: - Do an inspection/check of the electrical items - Do an integrity test of the related system(s) if applicable ( Ref AMM 05-51-43 P.Block 501). If there is no integrity test, do an operationnal or functionnal test of the related function(s).

 


 _________________________________________________________ELECTRICAL INSPECTIONS/CHECKS - DESCRIPTION AND OPERATION
 _______1. General This chapter gives general rules for electrical inspection/checks. 
R R R R R R R R  A. A connector was disconnect and at least one wire was reworkd, added, disconnected or reconnected: - Do a continuity test of the reworked or added wire before you connect the connector - Do a functional or operational test of the related system after connection 
R R R R  B. A connector was disconnected without wiring disconnection/rework: - Do a visual check of the connector locking - Do a functional test of at least one wire that goes through this connector (e.g. make sure that a pump or lamp operates when controlled)
 ________________________2. Structure of the Chapter
 A. Visual Checks (Ref. 20-52-11)
 B. Manual Checks (Ref. 20-52-12)
 C. Ageing Checks (Ref. 20-52-13)

 


 _________________________________________
VISUAL CHECKS - DESCRIPTION AND OPERATION
 _______
1. General
 This chapter gives the general inspection rules applicable to the different electrical installation components.
 _________2. Procedure
 A. Do a visual check of these components.
 (1)
 Wire harnesses
 Do a check for:


 -contact between the bundles or between the bundles and the structure,
 -loose bundles,
 -damaged cables,
 -missing cable ties and tapes,
 -worn or broken cable protection sheaths,
 -movement of the sheath end on the support component,
 -missing or damaged grommets.

 (2)
 Connectors
 Do a check for:

 

 -corrosion on shells,
 -damaged grommets,
 -incorrect retention of the cables at the backshells (broken tail),
 -cushion missing on backshell,
 -cable tie missing on backshell,
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 ESPM Electrical Standard Practices Manual 4(61)