• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:58来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 (c)
 Install the fitting (53) with the bolts (54) and the nuts (57).


 (d)
 Install the bolts (59) and (60) and the nuts (52).

 (e)
 Tighten the nuts (57).

 (f)
 Tighten the nuts (52).

 (g)
 Install the slide (47) on the locking lever (44) with the pin (45).

 (h)
 Put the spring (48) in position.

 (i)
 Install the slide (47) in the trunnion (49). Install the bolt (58).

 (j)
 Install the washer (56).

 (k)
 Install a new cotter pin (55).


 (2)
 Installation of the bellcrank (51).

 (a)
 Put the bellcrank (51) in position. Install the bolt (61).

 (b)
 Install the washer (26).

 (c)
 Install a new cotter pin (25).

 

 (3)
 Installation of the rod (40).

 (a)
 Put the rod (40) in position. Install the bolts (43) and (46).

 (b)
 Install the washers (41) and (39).

 (c)
 Install a new cotter pin (42).

 (d)
 Install a new cotter pin (38).

 

 (4)
 Installation of the control lever assembly (31).

 (a)
 Apply SEALANTS (Material No. 09-016) to the contact surfaces of the bracket (24).

 (b)
 Put the bracket (24) in position. Install the bolts (21) and (22) and the nuts (28) and (27).

 (c)
 Tighten the nuts (28) and (27).

 


 1EFF : ALL 1 56-12-12Page 409 1 1 May 01/05R 1 1 1CES 1


 (d)
 Put the control lever (31) in position. Install the bolt (23).

 (e)
 Install the washer (30).

 (f)
 Install a new cotter pin (29).


 (5) Installation of the rod (35).
 (a)
 Put the rod (35) in position. Install the bolts (50) and (32).

 (b)
 Install the washers (37) and (33).

 (c)
 Install a new cotter pin (34).


 (d) Install a new cotter pin (36). Subtask 56-12-12-720-050
 B. Testing
 (1) Do a functional test of the mechanism to make sure that it operates correctly.
 5. Close-up
________ Subtask 56-12-12-410-050
 A. Installation of the Access Panels
 (Ref. Fig. 401/TASK 56-12-12-991-001)

 (1)
 Make sure that the sliding window is open.

 (2)
 Installation of the panel 211PW, 212PW.

 (a)
 Put the panel 211PW, 212PW in position.

 (b)
 Install the washer (16) and the screw (15) and tighten them.

 (c)
 Tighten the fastener (1).

 

 (3)
 Installation of the lining panel 211DW, 212DW.

 (a)
 Put the lining panel 211DW, 212DW in position.

 (b)
 Tighten the fasteners (4)

 


 1EFF : ALL 1 56-12-12Page 410 1 1 May 01/05R 1 1 1CES 1


 (c)
 Install the washers (2) and (5) and the screws (3) and (6) and tighten them.

 (d)
 Installation of the lining panel 211GW, 212GW.

 (e)
 Put the electrical cable (13) in position on the lining panel.

 (f)
 Install the clamp (10), the washer (11) and the screw (12) on the support (14). Tighten the screw (12).

 (g)
 Put the lining panel 211GW, 212GW in position.

 (h)
 Tighten the fasteners (9).


 (i) Install the washers (7) and the screws (8) and tighten them. Subtask 56-12-12-865-052
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
 breaker(s): R 1DG1, 1DG2, 4DG1, 4DG2, 5DG1, 5DG2, 5SQ1, 5SQ2.
 Subtask 56-12-12-942-050
 C. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the access platform(s).


 1EFF : ALL 1 56-12-12Page 411 1 1 May 01/05 1 1 1CES 1

 TASK 56-12-12-000-002


 Removal of the Handle WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE
_______ OPENED, SAFETIED AND TAGGED.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINDOWS 风挡 窗户(84)